Dealing with construction … Dealing 0-15 Building control in United Arab Emirates

United Arab Emirates: Dealing with construction permits: Building quality control index was 15 DB16-20 methodology in 2019. ▲ Rising

Latest (2019)
15 DB16-20 methodology
Change on year
unchanged
World rank
1st
of 186 countries
All-time high
15 DB16-20 methodology
in 2017
All-time low
12 DB16-20 methodology
in 2014
Years of data
6
2014–2019

Dealing with construction permits: Building quality control index in United Arab Emirates, 2014–2019

0510152014201620192014: 12 DB16-20 methodology2015: 12 DB16-20 methodology2016: 13 DB16-20 methodology2017: 15 DB16-20 methodology2018: 15 DB16-20 methodology2019: 15 DB16-20 methodology

Source: World Bank. Measured in DB16-20 methodology.

Analysis

United Arab Emirates recorded 15 DB16-20 methodology for dealing with construction permits: building quality control index in 2019. That is the highest value across all 6 years on record.

That represents a change of up 25.0% over ten years.

United Arab Emirates ranks 1st of 186 countries on this measure, in the top 10%.

Dealing with construction permits: Building quality control index in United Arab Emirates, year by year

Annual values for Dealing with construction permits: Building quality control index (0-15) (DB16-20 methodology) in United Arab Emirates, 2014 to 2019.
Year DB16-20 methodology Change
2014 12 DB16-20 methodology —
2015 12 DB16-20 methodology +0.0%
2016 13 DB16-20 methodology +8.3%
2017 15 DB16-20 methodology +15.4%
2018 15 DB16-20 methodology +0.0%
2019 15 DB16-20 methodology +0.0%

United Arab Emirates compared with similar countries

  • United Arab Emirates's 15 DB16-20 methodology is above the median for high income countries, which is 12 DB16-20 methodology, 1.2× the median. (62 countries reporting)
  • United Arab Emirates's 15 DB16-20 methodology is above the median for Middle East, North Africa, Afghanistan & Pakistan, which is 12.99 DB16-20 methodology, 1.2× the median. (20 countries reporting)

Countries ranked near United Arab Emirates

  1. 1 China 15 DB16-20 methodology compare
  2. 1 Hong Kong 15 DB16-20 methodology compare
  3. 1 Luxembourg 15 DB16-20 methodology compare
  4. 1 New Zealand 15 DB16-20 methodology compare
  5. 1 Rwanda 15 DB16-20 methodology compare

See the full ranking of 186 places →

More private sector data for United Arab Emirates

All data for United Arab Emirates →

Frequently asked questions

What is dealing with construction permits: building quality control index in United Arab Emirates?
Dealing with construction permits: building quality control index in United Arab Emirates was 15 DB16-20 methodology in 2019, according to the World Bank.
What is the highest dealing with construction permits: building quality control index recorded in United Arab Emirates?
The highest recorded value was 15 DB16-20 methodology in 2017.
What is the lowest dealing with construction permits: building quality control index recorded in United Arab Emirates?
The lowest recorded value was 12 DB16-20 methodology in 2014.
How does United Arab Emirates rank for dealing with construction permits: building quality control index?
United Arab Emirates ranks 1st out of 186 countries with data for 2019.
Is dealing with construction permits: building quality control index rising or falling in United Arab Emirates?
Over the last ten years it is up 25.0%. The long-run trend across the full record is rising.
Where does this United Arab Emirates data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Building quality control index (0-15) (DB16-20 methodology). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 6 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

Share, cite or embed this page

Cite this page

Dealing with construction permits: Building quality control index in United Arab Emirates. Statizoid. Retrieved 07 October 2026, from https://private-sector.statizoid.com/stat/dealing-with-construction-permits-building-quality-control-index-0-15-db16-20-methodology-2/united-arab-emirates/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/stat/dealing-with-construction-permits-building-quality-control-index-0-15-db16-20-methodology-2/united-arab-emirates/">Dealing with construction permits: Building quality control index in United Arab Emirates</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Building quality control index (0-15) (DB16-20 methodology)
Unit
DB16-20 methodology
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
186 places, 1,115 data points, 2014–2019
Last refreshed

The building quality control index is the sum of the following six indices: quality of building regulations, quality control before construction, quality control during construction, quality control after construction, liability and insurance regimes and professional certifications. The component indicator is computed based on the methodology in the DB16-20 studies.