Dealing with construction permits: Cost in Bulgaria

Bulgaria: Dealing with construction permits: Cost was 3.4% in 2019. ▼ Falling

Latest (2019)
3.4%
Change on year
down 10.5%
World rank
75th
of 187 countries
All-time high
9.3%
in 2005
All-time low
3.4%
in 2019
Years of data
15
2005–2019

Dealing with construction permits: Cost in Bulgaria, 2005–2019

02468102005201220192005: 9.3 % of Warehouse value2006: 8.2 % of Warehouse value2007: 7.2 % of Warehouse value2008: 7 % of Warehouse value2009: 6 % of Warehouse value2010: 6.1 % of Warehouse value2011: 6 % of Warehouse value2012: 5.6 % of Warehouse value2013: 5.2 % of Warehouse value2014: 5.2 % of Warehouse value2015: 4.8 % of Warehouse value2016: 4.6 % of Warehouse value2017: 4.2 % of Warehouse value2018: 3.8 % of Warehouse value2019: 3.4 % of Warehouse value

Source: World Bank. Measured in % of Warehouse value.

Analysis

The most recent figure for dealing with construction permits: cost in Bulgaria is 3.4%, measured in 2019. That is the lowest value across all 15 years on record.

The figure is down 10.5% on the previous year and down 43.3% over ten years.

Over the whole period, dealing with construction permits: cost in Bulgaria peaked at 9.3% in 2005 and was at its lowest, 3.4%, in 2019.

That places Bulgaria 75th out of 187 countries with data for 2019, putting it in the middle of the range.

The long-run direction has been consistently falling across the 15 years of available data.

Averages by decade

DecadeAverage LowestHighest Years
2000s 7.5% 6.0% 9.3% 5
2010s 4.9% 3.4% 6.1% 10

Countries ranked near Bulgaria

  1. 73 Ghana 3.5% compare
  2. 73 North Macedonia 3.5% compare
  3. 75 Eswatini 3.4% compare
  4. 75 Italy 3.4% compare
  5. 75 Tunisia 3.4% compare

See the full ranking of 187 places →

More private sector data for Bulgaria

All data for Bulgaria →

Frequently asked questions

What is dealing with construction permits: cost in Bulgaria?
Dealing with construction permits: cost in Bulgaria was 3.4% in 2019, according to the World Bank.
What is the highest dealing with construction permits: cost recorded in Bulgaria?
The highest recorded value was 9.3% in 2005.
What is the lowest dealing with construction permits: cost recorded in Bulgaria?
The lowest recorded value was 3.4% in 2019.
How does Bulgaria rank for dealing with construction permits: cost?
Bulgaria ranks 75th out of 187 countries with data for 2019.
Is dealing with construction permits: cost rising or falling in Bulgaria?
Over the last ten years it is down 43.3%. The long-run trend across the full record is falling.
Where does this Bulgaria data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Cost (% of Warehouse value). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

Share, cite or embed this page

Cite this page

Dealing with construction permits: Cost in Bulgaria. Statizoid. Retrieved 22 August 2026, from https://private-sector.statizoid.com/stat/dealing-with-construction-permits-cost-percent-of-warehouse-value/bulgaria/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/stat/dealing-with-construction-permits-cost-percent-of-warehouse-value/bulgaria/">Dealing with construction permits: Cost in Bulgaria</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Cost (% of Warehouse value)
Unit
% of Warehouse value
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The cost records all official costs associated with completing the procedures to legally build a warehouse, including the costs associated with obtaining land use approvals and preconstruction design clearances; receiving inspections before, during and after construction; obtaining utility connections; and registering the warehouse at the property registry. It is calculated as a percentage of the warehouse value. Nonrecurring taxes required for the completion of the warehouse project are also recorded. Sales taxes (such as value added tax) or capital gains taxes are not recorded. Nor are deposits that must be paid up front and are later refunded.