Dealing with construction permits: Cost in Cote d'Ivoire
Cote d'Ivoire: Dealing with construction permits: Cost was 5.9% in 2019. ▼ Falling
Dealing with construction permits: Cost in Cote d'Ivoire, 2005–2019
Source: World Bank. Measured in % of Warehouse value.
Analysis
In 2019, dealing with construction permits: cost in Cote d'Ivoire stood at 5.9%.
That represents a change of up 1.7% on the previous year and down 9.2% over ten years.
Over the whole period, dealing with construction permits: cost in Cote d'Ivoire peaked at 7.2% in 2006 and was at its lowest, 4.0%, in 2015.
Cote d'Ivoire ranks 49th of 188 countries on this measure, in the middle of the range.
The long-run direction has been consistently falling across the 15 years of available data.
Dealing with construction permits: Cost in Cote d'Ivoire, year by year
| Year | % of Warehouse value | Change |
|---|---|---|
| 2005 | 7.1% | — |
| 2006 | 7.2% | +1.4% |
| 2007 | 7.0% | -2.8% |
| 2008 | 6.8% | -2.9% |
| 2009 | 6.5% | -4.4% |
| 2010 | 6.2% | -4.6% |
| 2011 | 6.3% | +1.6% |
| 2012 | 5.8% | -7.9% |
| 2013 | 5.1% | -12.1% |
| 2014 | 4.3% | -15.7% |
| 2015 | 4.0% | -7.0% |
| 2016 | 6.6% | +65.0% |
| 2017 | 6.0% | -9.1% |
| 2018 | 5.8% | -3.3% |
| 2019 | 5.9% | +1.7% |
Averages by decade
| Decade | Average | Lowest | Highest | Years |
|---|---|---|---|---|
| 2000s | 6.9% | 6.5% | 7.2% | 5 |
| 2010s | 5.6% | 4.0% | 6.6% | 10 |
Countries ranked near Cote d'Ivoire
More private sector data for Cote d'Ivoire
- Merchandise trade 47.9% (2025)
- Food imports 20.5% (2024)
- Manufactures imports 51.2% (2024)
- Merchandise imports 19.27 billion current US$ (2025)
- Food exports 47.2% (2024)
- Manufactures exports 8.0% (2024)
- Merchandise exports 28.47 billion current US$ (2025)
- Merchandise exports (current US$), per capita 870.37 current US$ per person (2025)
- Merchandise exports (current US$), per unit of GDP 0.2854 current US$ per US$ of GDP (2025)
- Merchandise exports (current US$), annual growth rate 38.55 % change on previous year (2025)
Frequently asked questions
- What is dealing with construction permits: cost in Cote d'Ivoire?
- Dealing with construction permits: cost in Cote d'Ivoire was 5.9% in 2019, according to the World Bank.
- What is the highest dealing with construction permits: cost recorded in Cote d'Ivoire?
- The highest recorded value was 7.2% in 2006.
- What is the lowest dealing with construction permits: cost recorded in Cote d'Ivoire?
- The lowest recorded value was 4.0% in 2015.
- How does Cote d'Ivoire rank for dealing with construction permits: cost?
- Cote d'Ivoire ranks 49th out of 188 countries with data for 2019.
- Is dealing with construction permits: cost rising or falling in Cote d'Ivoire?
- Over the last ten years it is down 9.2%. The long-run trend across the full record is falling.
- Where does this Cote d'Ivoire data come from?
- The figures come from the World Bank, published as part of Dealing with construction permits: Cost (% of Warehouse value). Statizoid updates them automatically from the source API.
Download this data
CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).
About this data
The cost records all official costs associated with completing the procedures to legally build a warehouse, including the costs associated with obtaining land use approvals and preconstruction design clearances; receiving inspections before, during and after construction; obtaining utility connections; and registering the warehouse at the property registry. It is calculated as a percentage of the warehouse value. Nonrecurring taxes required for the completion of the warehouse project are also recorded. Sales taxes (such as value added tax) or capital gains taxes are not recorded. Nor are deposits that must be paid up front and are later refunded.