Dealing with construction permits: Cost in Kyrgyzstan

Kyrgyzstan: Dealing with construction permits: Cost was 1.7% in 2019. ◆ Volatile

Latest (2019)
1.7%
Change on year
down 5.6%
World rank
116th
of 188 countries
All-time high
15.7%
in 2005
All-time low
1.7%
in 2019
Years of data
15
2005–2019

Dealing with construction permits: Cost in Kyrgyzstan, 2005–2019

0510152005201220192005: 15.7 % of Warehouse value2006: 14.8 % of Warehouse value2007: 13.3 % of Warehouse value2008: 6.9 % of Warehouse value2009: 3.9 % of Warehouse value2010: 3.5 % of Warehouse value2011: 3.8 % of Warehouse value2012: 3.2 % of Warehouse value2013: 2.9 % of Warehouse value2014: 2.5 % of Warehouse value2015: 2.2 % of Warehouse value2016: 2.2 % of Warehouse value2017: 2 % of Warehouse value2018: 1.8 % of Warehouse value2019: 1.7 % of Warehouse value

Source: World Bank. Measured in % of Warehouse value.

Analysis

The most recent figure for dealing with construction permits: cost in Kyrgyzstan is 1.7%, measured in 2019. That is the lowest value across all 15 years on record.

Compared with earlier readings it is down 5.6% on the previous year and down 56.4% over ten years.

Over the whole period, dealing with construction permits: cost in Kyrgyzstan peaked at 15.7% in 2005 and was at its lowest, 1.7%, in 2019.

Kyrgyzstan ranks 116th of 188 countries on this measure, in the middle of the range.

The series is highly variable year to year, so single readings are best treated with caution.

Dealing with construction permits: Cost in Kyrgyzstan, year by year

Annual values for Dealing with construction permits: Cost (% of Warehouse value) in Kyrgyzstan, 2005 to 2019.
Year % of Warehouse value Change
2005 15.7%
2006 14.8% -5.7%
2007 13.3% -10.1%
2008 6.9% -48.1%
2009 3.9% -43.5%
2010 3.5% -10.3%
2011 3.8% +8.6%
2012 3.2% -15.8%
2013 2.9% -9.4%
2014 2.5% -13.8%
2015 2.2% -12.0%
2016 2.2% +0.0%
2017 2.0% -9.1%
2018 1.8% -10.0%
2019 1.7% -5.6%

Averages by decade

DecadeAverage LowestHighest Years
2000s 10.9% 3.9% 15.7% 5
2010s 2.6% 1.7% 3.8% 10

Countries ranked near Kyrgyzstan

  1. 116 Azerbaijan 1.7% compare
  2. 116 Israel 1.7% compare
  3. 116 Peru 1.7% compare

See the full ranking of 188 places →

More private sector data for Kyrgyzstan

All data for Kyrgyzstan →

Frequently asked questions

What is dealing with construction permits: cost in Kyrgyzstan?
Dealing with construction permits: cost in Kyrgyzstan was 1.7% in 2019, according to the World Bank.
What is the highest dealing with construction permits: cost recorded in Kyrgyzstan?
The highest recorded value was 15.7% in 2005.
What is the lowest dealing with construction permits: cost recorded in Kyrgyzstan?
The lowest recorded value was 1.7% in 2019.
How does Kyrgyzstan rank for dealing with construction permits: cost?
Kyrgyzstan ranks 116th out of 188 countries with data for 2019.
Is dealing with construction permits: cost rising or falling in Kyrgyzstan?
Over the last ten years it is down 56.4%. The long-run trend across the full record is volatile.
Where does this Kyrgyzstan data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Cost (% of Warehouse value). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

Share, cite or embed this page

Cite this page

Dealing with construction permits: Cost in Kyrgyzstan. Statizoid. Retrieved 30 August 2026, from https://private-sector.statizoid.com/stat/dealing-with-construction-permits-cost-percent-of-warehouse-value/kyrgyz-republic/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/stat/dealing-with-construction-permits-cost-percent-of-warehouse-value/kyrgyz-republic/">Dealing with construction permits: Cost in Kyrgyzstan</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Cost (% of Warehouse value)
Unit
% of Warehouse value
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The cost records all official costs associated with completing the procedures to legally build a warehouse, including the costs associated with obtaining land use approvals and preconstruction design clearances; receiving inspections before, during and after construction; obtaining utility connections; and registering the warehouse at the property registry. It is calculated as a percentage of the warehouse value. Nonrecurring taxes required for the completion of the warehouse project are also recorded. Sales taxes (such as value added tax) or capital gains taxes are not recorded. Nor are deposits that must be paid up front and are later refunded.