{"entity":{"iso2":"ST","iso3":"STP","name":"Sao Tome and Principe","slug":"sao-tome-and-principe"},"indicator":{"licence":"CC BY 4.0 (World Bank Open Data)","slug":"dealing-with-construction-permits-cost-percent-of-warehouse-value","source":null,"source_url":"https://data.worldbank.org/indicator/IC.CNST.PRMT.COST.WRH.VAL","title":"Dealing with construction permits: Cost (% of Warehouse value)","unit":"% of Warehouse value"},"observations":[{"date":"2005-01-01","value":4.1},{"date":"2006-01-01","value":4.0},{"date":"2007-01-01","value":2.4},{"date":"2008-01-01","value":2.1},{"date":"2009-01-01","value":1.9},{"date":"2010-01-01","value":1.7},{"date":"2011-01-01","value":1.3},{"date":"2012-01-01","value":3.1},{"date":"2013-01-01","value":3.0},{"date":"2014-01-01","value":2.8},{"date":"2015-01-01","value":2.7},{"date":"2016-01-01","value":2.6},{"date":"2017-01-01","value":2.3},{"date":"2018-01-01","value":2.2},{"date":"2019-01-01","value":2.2}],"summary":{"latest_period":"2019-01-01","latest_value":2.2,"max":4.1,"mean":2.56,"min":1.3,"of":188,"rank":100,"trend":"falling"}}
