Dealing with construction permits: Cost in Saudi Arabia
Saudi Arabia: Dealing with construction permits: Cost was 1.9% in 2019. ▲ Rising
Dealing with construction permits: Cost in Saudi Arabia, 2005–2019
Source: World Bank. Measured in % of Warehouse value.
Analysis
In 2019, dealing with construction permits: cost in Saudi Arabia stood at 1.9%.
Compared with earlier readings it is down 9.5% on the previous year and up 280.0% over ten years.
Over the whole period, dealing with construction permits: cost in Saudi Arabia peaked at 2.4% in 2011 and was at its lowest, 0.5%, in 2009.
Saudi Arabia ranks 108th of 188 countries on this measure, in the middle of the range.
The long-run direction has been consistently rising across the 15 years of available data.
Dealing with construction permits: Cost in Saudi Arabia, year by year
| Year | % of Warehouse value | Change |
|---|---|---|
| 2005 | 0.9% | — |
| 2006 | 0.7% | -22.2% |
| 2007 | 0.6% | -14.3% |
| 2008 | 0.6% | +0.0% |
| 2009 | 0.5% | -16.7% |
| 2010 | 0.7% | +40.0% |
| 2011 | 2.4% | +242.9% |
| 2012 | 1.9% | -20.8% |
| 2013 | 1.9% | +0.0% |
| 2014 | 1.5% | -21.1% |
| 2015 | 1.6% | +6.7% |
| 2016 | 1.9% | +18.7% |
| 2017 | 2.1% | +10.5% |
| 2018 | 2.1% | +0.0% |
| 2019 | 1.9% | -9.5% |
Averages by decade
| Decade | Average | Lowest | Highest | Years |
|---|---|---|---|---|
| 2000s | 0.7% | 0.5% | 0.9% | 5 |
| 2010s | 1.8% | 0.7% | 2.4% | 10 |
Countries ranked near Saudi Arabia
More private sector data for Saudi Arabia
- Merchandise trade 44.2% (2025)
- Food imports 13.0% (2024)
- Manufactures imports 70.5% (2024)
- Merchandise imports 254.06 billion current US$ (2025)
- Food exports 1.9% (2024)
- Manufactures exports 15.9% (2024)
- Merchandise exports 310.67 billion current US$ (2025)
- Merchandise exports (current US$), per capita 8,403 current US$ per person (2025)
- Merchandise exports (current US$), per unit of GDP 0.2433 current US$ per US$ of GDP (2025)
- Merchandise exports (current US$), annual growth rate 1.69 % change on previous year (2025)
Frequently asked questions
- What is dealing with construction permits: cost in Saudi Arabia?
- Dealing with construction permits: cost in Saudi Arabia was 1.9% in 2019, according to the World Bank.
- What is the highest dealing with construction permits: cost recorded in Saudi Arabia?
- The highest recorded value was 2.4% in 2011.
- What is the lowest dealing with construction permits: cost recorded in Saudi Arabia?
- The lowest recorded value was 0.5% in 2009.
- How does Saudi Arabia rank for dealing with construction permits: cost?
- Saudi Arabia ranks 108th out of 188 countries with data for 2019.
- Is dealing with construction permits: cost rising or falling in Saudi Arabia?
- Over the last ten years it is up 280.0%. The long-run trend across the full record is rising.
- Where does this Saudi Arabia data come from?
- The figures come from the World Bank, published as part of Dealing with construction permits: Cost (% of Warehouse value). Statizoid updates them automatically from the source API.
Download this data
CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).
About this data
The cost records all official costs associated with completing the procedures to legally build a warehouse, including the costs associated with obtaining land use approvals and preconstruction design clearances; receiving inspections before, during and after construction; obtaining utility connections; and registering the warehouse at the property registry. It is calculated as a percentage of the warehouse value. Nonrecurring taxes required for the completion of the warehouse project are also recorded. Sales taxes (such as value added tax) or capital gains taxes are not recorded. Nor are deposits that must be paid up front and are later refunded.