Dealing with construction permits: Cost in Saint Kitts and Nevis

Saint Kitts and Nevis: Dealing with construction permits: Cost was 0.4% in 2019. ▲ Rising

Latest (2019)
0.4%
Change on year
unchanged
World rank
166th
of 188 countries
All-time high
0.6%
in 2014
All-time low
0.3%
in 2008
Years of data
15
2005–2019

Dealing with construction permits: Cost in Saint Kitts and Nevis, 2005–2019

00.20.40.62005201220192005: 0.4 % of Warehouse value2006: 0.4 % of Warehouse value2007: 0.4 % of Warehouse value2008: 0.3 % of Warehouse value2009: 0.3 % of Warehouse value2010: 0.4 % of Warehouse value2011: 0.4 % of Warehouse value2012: 0.3 % of Warehouse value2013: 0.3 % of Warehouse value2014: 0.6 % of Warehouse value2015: 0.5 % of Warehouse value2016: 0.5 % of Warehouse value2017: 0.5 % of Warehouse value2018: 0.4 % of Warehouse value2019: 0.4 % of Warehouse value

Source: World Bank. Measured in % of Warehouse value.

Analysis

In 2019, dealing with construction permits: cost in Saint Kitts and Nevis stood at 0.4%.

That represents a change of up 33.3% over ten years.

Over the whole period, dealing with construction permits: cost in Saint Kitts and Nevis peaked at 0.6% in 2014 and was at its lowest, 0.3%, in 2008.

Saint Kitts and Nevis ranks 166th of 188 countries on this measure, in the bottom quarter.

The long-run direction has been consistently rising across the 15 years of available data.

Dealing with construction permits: Cost in Saint Kitts and Nevis, year by year

Annual values for Dealing with construction permits: Cost (% of Warehouse value) in Saint Kitts and Nevis, 2005 to 2019.
Year % of Warehouse value Change
2005 0.4%
2006 0.4% +0.0%
2007 0.4% +0.0%
2008 0.3% -25.0%
2009 0.3% +0.0%
2010 0.4% +33.3%
2011 0.4% +0.0%
2012 0.3% -25.0%
2013 0.3% +0.0%
2014 0.6% +100.0%
2015 0.5% -16.7%
2016 0.5% +0.0%
2017 0.5% +0.0%
2018 0.4% -20.0%
2019 0.4% +0.0%

Averages by decade

DecadeAverage LowestHighest Years
2000s 0.4% 0.3% 0.4% 5
2010s 0.4% 0.3% 0.6% 10

Countries ranked near Saint Kitts and Nevis

  1. 166 Botswana 0.4% compare
  2. 166 Latvia 0.4% compare
  3. 166 Maldives 0.4% compare
  4. 166 Mauritius 0.4% compare
  5. 166 Taiwan 0.4% compare

See the full ranking of 188 places →

More private sector data for Saint Kitts and Nevis

All data for Saint Kitts and Nevis →

Frequently asked questions

What is dealing with construction permits: cost in Saint Kitts and Nevis?
Dealing with construction permits: cost in Saint Kitts and Nevis was 0.4% in 2019, according to the World Bank.
What is the highest dealing with construction permits: cost recorded in Saint Kitts and Nevis?
The highest recorded value was 0.6% in 2014.
What is the lowest dealing with construction permits: cost recorded in Saint Kitts and Nevis?
The lowest recorded value was 0.3% in 2008.
How does Saint Kitts and Nevis rank for dealing with construction permits: cost?
Saint Kitts and Nevis ranks 166th out of 188 countries with data for 2019.
Is dealing with construction permits: cost rising or falling in Saint Kitts and Nevis?
Over the last ten years it is up 33.3%. The long-run trend across the full record is rising.
Where does this Saint Kitts and Nevis data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Cost (% of Warehouse value). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

Share, cite or embed this page

Cite this page

Dealing with construction permits: Cost in Saint Kitts and Nevis. Statizoid. Retrieved 28 August 2026, from https://private-sector.statizoid.com/stat/dealing-with-construction-permits-cost-percent-of-warehouse-value/st-kitts-and-nevis/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/stat/dealing-with-construction-permits-cost-percent-of-warehouse-value/st-kitts-and-nevis/">Dealing with construction permits: Cost in Saint Kitts and Nevis</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Cost (% of Warehouse value)
Unit
% of Warehouse value
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The cost records all official costs associated with completing the procedures to legally build a warehouse, including the costs associated with obtaining land use approvals and preconstruction design clearances; receiving inspections before, during and after construction; obtaining utility connections; and registering the warehouse at the property registry. It is calculated as a percentage of the warehouse value. Nonrecurring taxes required for the completion of the warehouse project are also recorded. Sales taxes (such as value added tax) or capital gains taxes are not recorded. Nor are deposits that must be paid up front and are later refunded.