Dealing with construction permits (DB06-15 methodology) - Score in Chad

Chad: Dealing with construction permits (DB06-15 methodology) - Score was 41.65 in 2014. ▬ Flat

Latest (2014)
41.65
Change on year
down 5.1%
World rank
161st
of 181 countries
All-time high
44.01
in 2011
All-time low
41.59
in 2005
Years of data
10
2005–2014

Dealing with construction permits (DB06-15 methodology) - Score in Chad, 2005–2014

0102030402005200920142005: 41.62006: 41.62007: 41.62008: 42.42009: 42.62010: 422011: 442012: 41.62013: 43.92014: 41.6

Source: World Bank.

Analysis

Chad recorded 41.65 for dealing with construction permits (db06-15 methodology) - score in 2014.

The figure is down 5.1% on the previous year and up 0.1% over ten years.

Over the whole period, dealing with construction permits (db06-15 methodology) - score in Chad peaked at 44.01 in 2011 and was at its lowest, 41.59, in 2005.

Chad ranks 161st of 181 countries on this measure, in the bottom quarter.

Averages by decade

DecadeAverage LowestHighest Years
2000s 41.96 41.59 42.58 5
2010s 42.64 41.64 44.01 5

Countries ranked near Chad

  1. 158 Pakistan 44.69 compare
  2. 159 Albania 44.54 compare
  3. 160 Lebanon 42.42 compare
  4. 162 Cameroon 40.97 compare
  5. 163 Sierra Leone 40.64 compare
  6. 164 Afghanistan 39.38 compare

See the full ranking of 183 places →

More private sector data for Chad

All data for Chad →

Frequently asked questions

What is dealing with construction permits (db06-15 methodology) - score in Chad?
Dealing with construction permits (db06-15 methodology) - score in Chad was 41.65 in 2014, according to the World Bank.
What is the highest dealing with construction permits (db06-15 methodology) - score recorded in Chad?
The highest recorded value was 44.01 in 2011.
What is the lowest dealing with construction permits (db06-15 methodology) - score recorded in Chad?
The lowest recorded value was 41.59 in 2005.
How does Chad rank for dealing with construction permits (db06-15 methodology) - score?
Chad ranks 161st out of 181 countries with data for 2014.
Is dealing with construction permits (db06-15 methodology) - score rising or falling in Chad?
Over the last ten years it is up 0.1%. The long-run trend across the full record is flat.
Where does this Chad data come from?
The figures come from the World Bank, published as part of Dealing with construction permits (DB06-15 methodology) - Score. Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 10 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Dealing with construction permits (DB06-15 methodology) - Score
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
183 places, 1,813 data points, 2005–2014
Last refreshed

The score for dealing with construction permits is the simple average of the scores for each of the component indicators: the procedures, time, cost to deal with construction permits, as well as the building quality control index that evaluate the quality of building regulations, the strength of quality control and safety mechanisms, liability and insurance regimes and professional certification requirements. The score is computed based on the methodology in the DB06-15 studies.