Dealing with construction permits: Procedures (number) (Dealing) in Tanzania

Tanzania: Dealing with construction permits: Procedures was 24 number in 2019. ▲ Rising

Latest (2019)
24 number
Change on year
unchanged
World rank
3rd
of 188 countries
All-time high
24 number
in 2015
All-time low
21 number
in 2005
Years of data
15
2005–2019

Dealing with construction permits: Procedures in Tanzania, 2005–2019

05101520252005201220192005: 21 number2006: 21 number2007: 21 number2008: 21 number2009: 21 number2010: 22 number2011: 22 number2012: 22 number2013: 22 number2014: 23 number2015: 24 number2016: 24 number2017: 24 number2018: 24 number2019: 24 number

Source: World Bank. Measured in number.

Analysis

The most recent figure for dealing with construction permits: procedures in Tanzania is 24 number, measured in 2019. That is the highest value across all 15 years on record.

That represents a change of up 14.3% over ten years.

Over the whole period, dealing with construction permits: procedures in Tanzania peaked at 24 number in 2015 and was at its lowest, 21 number, in 2005.

Tanzania ranks 3rd of 188 countries on this measure, in the top 10%.

The long-run direction has been consistently rising across the 15 years of available data.

Dealing with construction permits: Procedures in Tanzania, year by year

Annual values for Dealing with construction permits: Procedures (number) in Tanzania, 2005 to 2019.
Year number Change
2005 21 number —
2006 21 number +0.0%
2007 21 number +0.0%
2008 21 number +0.0%
2009 21 number +0.0%
2010 22 number +4.8%
2011 22 number +0.0%
2012 22 number +0.0%
2013 22 number +0.0%
2014 23 number +4.5%
2015 24 number +4.3%
2016 24 number +0.0%
2017 24 number +0.0%
2018 24 number +0.0%
2019 24 number +0.0%

Tanzania compared with similar countries

  • Tanzania's 24 number is above the median for lower middle income countries, which is 15.78 number, 1.5× the median. (47 countries reporting)
  • Tanzania's 24 number is above the median for Sub-Saharan Africa, which is 15 number, 1.6× the median. (46 countries reporting)

Averages by decade

DecadeAverage LowestHighest Years
2000s 21 number 21 number 21 number 5
2010s 23.1 number 22 number 24 number 10

Countries ranked near Tanzania

  1. 1 Tajikistan 26 number compare
  2. 2 Liberia 25 number compare
  3. 3 Romania 24 number compare
  4. 5 South Sudan 23 number compare
  5. 6 Cote d'Ivoire 22 number compare
  6. 6 Croatia 22 number compare
  7. 6 Hungary 22 number compare
  8. 6 Lebanon 22 number compare
  9. 6 Philippines 22 number compare
  10. 6 Puerto Rico 22 number compare

See the full ranking of 188 places →

More private sector data for Tanzania

All data for Tanzania →

Frequently asked questions

What is dealing with construction permits: procedures in Tanzania?
Dealing with construction permits: procedures in Tanzania was 24 number in 2019, according to the World Bank.
What is the highest dealing with construction permits: procedures recorded in Tanzania?
The highest recorded value was 24 number in 2015.
What is the lowest dealing with construction permits: procedures recorded in Tanzania?
The lowest recorded value was 21 number in 2005.
How does Tanzania rank for dealing with construction permits: procedures?
Tanzania ranks 3rd out of 188 countries with data for 2019.
Is dealing with construction permits: procedures rising or falling in Tanzania?
Over the last ten years it is up 14.3%. The long-run trend across the full record is rising.
Where does this Tanzania data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Procedures (number). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

Share, cite or embed this page

Cite this page

Dealing with construction permits: Procedures in Tanzania. Statizoid. Retrieved 07 October 2026, from https://private-sector.statizoid.com/stat/dealing-with-construction-permits-procedures-number/tanzania/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/stat/dealing-with-construction-permits-procedures-number/tanzania/">Dealing with construction permits: Procedures in Tanzania</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Procedures (number)
Unit
number
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The number of procedures records all interactions of the building company’s employees or any party acting on its behalf with external parties, including government agencies, notaries, the land registry, the cadastre, utility companies and public inspectors. Procedures that the company undergoes to connect the warehouse to water and sewerage are included. All procedures that are legally required and that are done in practice by a majority of companies are counted, even if they may be avoided in exceptional cases.