Dealing with construction permits: Quality control during in Nicaragua

Nicaragua: Dealing with construction permits: Quality control during was 0 DB16-20 methodology in 2019. β–¬ Flat

Latest (2019)
0 DB16-20 methodology
World rank
159th
of 185 countries
All-time high
0 DB16-20 methodology
in 2014
All-time low
0 DB16-20 methodology
in 2014
Years of data
6
2014–2019

Dealing with construction permits: Quality control during in Nicaragua, 2014–2019

00.20.40.60.812014201620192014: 0 DB16-20 methodology2015: 0 DB16-20 methodology2016: 0 DB16-20 methodology2017: 0 DB16-20 methodology2018: 0 DB16-20 methodology2019: 0 DB16-20 methodology

Source: World Bank. Measured in DB16-20 methodology.

Analysis

The most recent figure for dealing with construction permits: quality control during in Nicaragua is 0 DB16-20 methodology, measured in 2019. That is the highest value across all 6 years on record.

That places Nicaragua 159th out of 185 countries with data for 2019, putting it in the bottom quarter.

Countries ranked near Nicaragua

  1. 159 Brazil 0 DB16-20 methodology compare
  2. 159 Afghanistan, Islamic Republic of 0 DB16-20 methodology compare
  3. 159 Angola 0 DB16-20 methodology compare
  4. 159 Barbados 0 DB16-20 methodology compare
  5. 159 Belize 0 DB16-20 methodology compare
  6. 159 Benin 0 DB16-20 methodology compare
  7. 159 Colombia 0 DB16-20 methodology compare
  8. 159 Comoros, Union of the 0 DB16-20 methodology compare
  9. 159 Ecuador 0 DB16-20 methodology compare
  10. 159 Equatorial Guinea, Republic of 0 DB16-20 methodology compare
  11. 159 Gabon 0 DB16-20 methodology compare
  12. 159 Gambia, The 0 DB16-20 methodology compare
  13. 159 Guinea-Bissau 0 DB16-20 methodology compare
  14. 159 Iraq 0 DB16-20 methodology compare
  15. 159 Lesotho, Kingdom of 0 DB16-20 methodology compare
  16. 159 Liberia 0 DB16-20 methodology compare
  17. 159 Madagascar, Republic of 0 DB16-20 methodology compare
  18. 159 Mali 0 DB16-20 methodology compare
  19. 159 Marshall Islands, Republic of the 0 DB16-20 methodology compare
  20. 159 Mauritania, Islamic Republic of 0 DB16-20 methodology compare
  21. 159 Micronesia, Federated States of 0 DB16-20 methodology compare
  22. 159 Niger 0 DB16-20 methodology compare
  23. 159 Panama 0 DB16-20 methodology compare
  24. 159 Paraguay 0 DB16-20 methodology compare
  25. 159 Samoa 0 DB16-20 methodology compare
  26. 159 Suriname 0 DB16-20 methodology compare

See the full ranking of 185 places β†’

More private sector data for Nicaragua

All data for Nicaragua β†’

Frequently asked questions

What is dealing with construction permits: quality control during in Nicaragua?
Dealing with construction permits: quality control during in Nicaragua was 0 DB16-20 methodology in 2019, according to the World Bank.
What is the highest dealing with construction permits: quality control during recorded in Nicaragua?
The highest recorded value was 0 DB16-20 methodology in 2014.
What is the lowest dealing with construction permits: quality control during recorded in Nicaragua?
The lowest recorded value was 0 DB16-20 methodology in 2014.
How does Nicaragua rank for dealing with construction permits: quality control during?
Nicaragua ranks 159th out of 185 countries with data for 2019.
Where does this Nicaragua data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Quality control during construction index (0-3) (DB16-20 methodology). Statizoid updates them automatically from the source API.

Download this data

CSV Β· JSON β€” 6 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

Share, cite or embed this page

Cite this page

Dealing with construction permits: Quality control during in Nicaragua. Statizoid. Retrieved 18 August 2026, from https://private-sector.statizoid.com/stat/dealing-with-construction-permits-quality-control-during-construction-index-0-3-db16-20/nicaragua/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/stat/dealing-with-construction-permits-quality-control-during-construction-index-0-3-db16-20/nicaragua/">Dealing with construction permits: Quality control during in Nicaragua</a> β€” Statizoid

About this data

Indicator
Dealing with construction permits: Quality control during construction index (0-3) (DB16-20 methodology)
Unit
DB16-20 methodology
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
185 places, 1,109 data points, 2014–2019
Last refreshed

The quality control during construction index evaluates quality control during the construction process. It has two components: (i) whether inspections are mandated by law during the construction process; (ii) whether inspections during construction are implemented in practice. The index is computed based on the methodology in the DB16-20 studies.