Dealing with construction permits: Time (days) - Score in Cambodia
Cambodia: Dealing with construction permits: Time (days) - Score was 0 in 2019. ▬ Flat
Dealing with construction permits: Time (days) - Score in Cambodia, 2005–2019
Source: World Bank.
Analysis
The most recent figure for dealing with construction permits: time (days) - score in Cambodia is 0, measured in 2019. That is the highest value across all 15 years on record.
Over the whole period, dealing with construction permits: time (days) - score in Cambodia peaked at 0 in 2005 and was at its lowest, 0, in 2005.
Cambodia ranks 180th of 188 countries on this measure, in the bottom quarter.
Averages by decade
| Decade | Average | Lowest | Highest | Years |
|---|---|---|---|---|
| 2000s | 0 | 0 | 0 | 5 |
| 2010s | 0 | 0 | 0 | 10 |
Countries ranked near Cambodia
More private sector data for Cambodia
- Merchandise trade 127.1% (2025)
- Food imports 7.5% (2024)
- Manufactures imports 72.5% (2024)
- Merchandise imports 33.88 billion current US$ (2025)
- Food exports 15.2% (2024)
- Manufactures exports 78.1% (2024)
- Merchandise exports 31.27 billion current US$ (2025)
- Commercial service exports 5.16 billion current US$ (2025)
- Transport services 54.3% (2025)
- Computer, communications and other services 16.6% (2025)
Frequently asked questions
- What is dealing with construction permits: time (days) - score in Cambodia?
- Dealing with construction permits: time (days) - score in Cambodia was 0 in 2019, according to the World Bank.
- What is the highest dealing with construction permits: time (days) - score recorded in Cambodia?
- The highest recorded value was 0 in 2005.
- What is the lowest dealing with construction permits: time (days) - score recorded in Cambodia?
- The lowest recorded value was 0 in 2005.
- How does Cambodia rank for dealing with construction permits: time (days) - score?
- Cambodia ranks 180th out of 188 countries with data for 2019.
- Where does this Cambodia data come from?
- The figures come from the World Bank, published as part of Dealing with construction permits: Time (days) - Score. Statizoid updates them automatically from the source API.
Download this data
CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).
About this data
The score for time benchmarks economies with respect to the regulatory best practice on the indicator. The score ranges from 0 to 100, where 0 represents the worst regulatory performance and 100 the best regulatory performance.