Dealing with construction permits: Time (days) - Score in Suriname

Suriname: Dealing with construction permits: Time (days) - Score was 43.23 in 2019. ▲ Rising

Latest (2019)
43.23
Change on year
unchanged
World rank
158th
of 188 countries
All-time high
43.23
in 2013
All-time low
34.58
in 2005
Years of data
15
2005–2019

Dealing with construction permits: Time (days) - Score in Suriname, 2005–2019

0102030402005201220192005: 34.62006: 34.62007: 34.62008: 34.62009: 34.62010: 34.62011: 34.62012: 34.62013: 43.22014: 43.22015: 43.22016: 43.22017: 43.22018: 43.22019: 43.2

Source: World Bank.

Analysis

The most recent figure for dealing with construction permits: time (days) - score in Suriname is 43.23, measured in 2019. That is the highest value across all 15 years on record.

That represents a change of up 25.0% over ten years.

Over the whole period, dealing with construction permits: time (days) - score in Suriname peaked at 43.23 in 2013 and was at its lowest, 34.58, in 2005.

That places Suriname 158th out of 188 countries with data for 2019, putting it in the bottom quarter.

The long-run direction has been consistently rising across the 15 years of available data.

Averages by decade

DecadeAverage LowestHighest Years
2000s 34.58 34.58 34.58 5
2010s 40.63 34.58 43.23 10

Countries ranked near Suriname

  1. 155 Papua New Guinea 44.96 compare
  2. 156 Central African Republic 44.38 compare
  3. 157 Austria 43.52 compare
  4. 159 Nicaragua 42.65 compare
  5. 160 Chad 42.36 compare
  6. 160 Guatemala 42.36 compare

See the full ranking of 190 places →

More private sector data for Suriname

All data for Suriname →

Frequently asked questions

What is dealing with construction permits: time (days) - score in Suriname?
Dealing with construction permits: time (days) - score in Suriname was 43.23 in 2019, according to the World Bank.
What is the highest dealing with construction permits: time (days) - score recorded in Suriname?
The highest recorded value was 43.23 in 2013.
What is the lowest dealing with construction permits: time (days) - score recorded in Suriname?
The lowest recorded value was 34.58 in 2005.
How does Suriname rank for dealing with construction permits: time (days) - score?
Suriname ranks 158th out of 188 countries with data for 2019.
Is dealing with construction permits: time (days) - score rising or falling in Suriname?
Over the last ten years it is up 25.0%. The long-run trend across the full record is rising.
Where does this Suriname data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days) - Score. Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Dealing with construction permits: Time (days) - Score
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
190 places, 2,783 data points, 2005–2019
Last refreshed

The score for time benchmarks economies with respect to the regulatory best practice on the indicator. The score ranges from 0 to 100, where 0 represents the worst regulatory performance and 100 the best regulatory performance.