Dealing with construction permits: Time (days) - Score in Uzbekistan
Uzbekistan: Dealing with construction permits: Time (days) - Score was 36.6 in 2019. ▲ Rising
Dealing with construction permits: Time (days) - Score in Uzbekistan, 2005–2019
Source: World Bank.
Analysis
Uzbekistan recorded 36.6 for dealing with construction permits: time (days) - score in 2019. That is the highest value across all 15 years on record.
That represents a change of up 13.4% over ten years.
Over the whole period, dealing with construction permits: time (days) - score in Uzbekistan peaked at 36.6 in 2017 and was at its lowest, 32.28, in 2005.
That places Uzbekistan 163rd out of 188 countries with data for 2019, putting it in the bottom quarter.
The long-run direction has been consistently rising across the 15 years of available data.
Averages by decade
| Decade | Average | Lowest | Highest | Years |
|---|---|---|---|---|
| 2000s | 32.28 | 32.28 | 32.28 | 5 |
| 2010s | 33.92 | 32.28 | 36.6 | 10 |
Countries ranked near Uzbekistan
More private sector data for Uzbekistan
- Merchandise trade 44.5% (2025)
- Food imports 12.4% (2024)
- Manufactures imports 71.9% (2024)
- Merchandise imports 41.75 billion current US$ (2025)
- Food exports 11.4% (2024)
- Manufactures exports 29.0% (2024)
- Merchandise exports 23.65 billion current US$ (2025)
- Commercial service exports 9.25 billion current US$ (2025)
- Transport services 44.6% (2025)
- Computer, communications and other services 10.5% (2025)
Frequently asked questions
- What is dealing with construction permits: time (days) - score in Uzbekistan?
- Dealing with construction permits: time (days) - score in Uzbekistan was 36.6 in 2019, according to the World Bank.
- What is the highest dealing with construction permits: time (days) - score recorded in Uzbekistan?
- The highest recorded value was 36.6 in 2017.
- What is the lowest dealing with construction permits: time (days) - score recorded in Uzbekistan?
- The lowest recorded value was 32.28 in 2005.
- How does Uzbekistan rank for dealing with construction permits: time (days) - score?
- Uzbekistan ranks 163rd out of 188 countries with data for 2019.
- Is dealing with construction permits: time (days) - score rising or falling in Uzbekistan?
- Over the last ten years it is up 13.4%. The long-run trend across the full record is rising.
- Where does this Uzbekistan data come from?
- The figures come from the World Bank, published as part of Dealing with construction permits: Time (days) - Score. Statizoid updates them automatically from the source API.
Download this data
CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).
About this data
The score for time benchmarks economies with respect to the regulatory best practice on the indicator. The score ranges from 0 to 100, where 0 represents the worst regulatory performance and 100 the best regulatory performance.