Dealing with construction, procedures in Tanzania

Tanzania: Dealing with construction, procedures was 19 number in 2012. ▲ Rising

Latest (2012)
19 number
Change on year
unchanged
World rank
7th
of 50 countries
All-time high
19 number
in 2009
All-time low
18 number
in 2005
Years of data
8
2005–2012

Dealing with construction, procedures in Tanzania, 2005–2012

051015202005200820122005: 18 number2006: 18 number2007: 18 number2008: 18 number2009: 19 number2010: 19 number2011: 19 number2012: 19 number

Source: World Bank, Doing Business project (http://www.doingbusiness.org/). Measured in number.

Analysis

In 2012, dealing with construction, procedures in Tanzania stood at 19 number. That is the highest value across all 8 years on record.

Compared with earlier readings it is up 5.6% over ten years.

Tanzania ranks 7th of 50 countries on this measure, in the top quarter.

Averages by decade

DecadeAverage LowestHighest Years
2000s 18.2 number 18 number 19 number 5
2010s 19 number 19 number 19 number 3

Countries ranked near Tanzania

  1. 5 Burundi 21 number compare
  2. 6 Sierra Leone 20 number compare
  3. 7 Algeria 19 number compare
  4. 9 Central African Republic 18 number compare
  5. 9 Malawi 18 number compare

See the full ranking of 56 places →

More private sector data for Tanzania

All data for Tanzania →

Frequently asked questions

What is dealing with construction, procedures in Tanzania?
Dealing with construction, procedures in Tanzania was 19 number in 2012, according to World Bank, Doing Business project (http://www.doingbusiness.org/).
What is the highest dealing with construction, procedures recorded in Tanzania?
The highest recorded value was 19 number in 2009.
What is the lowest dealing with construction, procedures recorded in Tanzania?
The lowest recorded value was 18 number in 2005.
How does Tanzania rank for dealing with construction, procedures?
Tanzania ranks 7th out of 50 countries with data for 2012.
Is dealing with construction, procedures rising or falling in Tanzania?
Over the last ten years it is up 5.6%. The long-run trend across the full record is rising.
Where does this Tanzania data come from?
The figures come from World Bank, Doing Business project (http://www.doingbusiness.org/), published as part of Dealing with construction, procedures (number). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 8 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Dealing with construction, procedures (number)
Unit
number
Source
World Bank, Doing Business project (http://www.doingbusiness.org/)
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
56 places, 447 data points, 2005–2012
Last refreshed

A procedure is any interaction of the company’s employees or managers with external parties, including government agencies, notaries, the land registry, the cadastre, utility com­panies, public and private inspectors and technical experts apart from in-house architects and engineers. Interactions between company employees, such as development of the warehouse plans and inspections conducted by employees, are not counted as procedures. Procedures that the company undergoes to connect to electricity, water, sewerage and phone services are included. All procedures that are legally or in practice required for building a warehouse are counted, even if they may be avoided in exceptional cases. For more information, visit http://www.doingbusiness.org/MethodologySurveys/.