Dealing with construction, procedures in Zimbabwe
Zimbabwe: Dealing with construction, procedures was 12 number in 2012. ▬ Flat
Dealing with construction, procedures in Zimbabwe, 2005–2012
Source: World Bank, Doing Business project (http://www.doingbusiness.org/). Measured in number.
Analysis
The most recent figure for dealing with construction, procedures in Zimbabwe is 12 number, measured in 2012. That is the highest value across all 8 years on record.
The figure is unchanged over ten years.
Zimbabwe ranks 36th of 50 countries on this measure, in the middle of the range.
Averages by decade
| Decade | Average | Lowest | Highest | Years |
|---|---|---|---|---|
| 2000s | 12 number | 12 number | 12 number | 5 |
| 2010s | 12 number | 12 number | 12 number | 3 |
Countries ranked near Zimbabwe
More private sector data for Zimbabwe
- Merchandise trade 38.7% (2025)
- Food imports 19.0% (2024)
- Manufactures imports 58.3% (2024)
- Merchandise imports 10.11 billion current US$ (2025)
- Food exports 21.6% (2024)
- Manufactures exports 6.7% (2024)
- Merchandise exports 9.71 billion current US$ (2025)
- Commercial service exports 438.49 million current US$ (2024)
- Transport services 34.1% (2024)
- Computer, communications and other services 37.1% (2024)
Frequently asked questions
- What is dealing with construction, procedures in Zimbabwe?
- Dealing with construction, procedures in Zimbabwe was 12 number in 2012, according to World Bank, Doing Business project (http://www.doingbusiness.org/).
- What is the highest dealing with construction, procedures recorded in Zimbabwe?
- The highest recorded value was 12 number in 2005.
- What is the lowest dealing with construction, procedures recorded in Zimbabwe?
- The lowest recorded value was 12 number in 2005.
- How does Zimbabwe rank for dealing with construction, procedures?
- Zimbabwe ranks 36th out of 50 countries with data for 2012.
- Is dealing with construction, procedures rising or falling in Zimbabwe?
- Over the last ten years it is unchanged. The long-run trend across the full record is flat.
- Where does this Zimbabwe data come from?
- The figures come from World Bank, Doing Business project (http://www.doingbusiness.org/), published as part of Dealing with construction, procedures (number). Statizoid updates them automatically from the source API.
Download this data
CSV · JSON — 8 observations, free to reuse under CC BY 4.0 (World Bank Open Data).
About this data
A procedure is any interaction of the company’s employees or managers with external parties, including government agencies, notaries, the land registry, the cadastre, utility companies, public and private inspectors and technical experts apart from in-house architects and engineers. Interactions between company employees, such as development of the warehouse plans and inspections conducted by employees, are not counted as procedures. Procedures that the company undergoes to connect to electricity, water, sewerage and phone services are included. All procedures that are legally or in practice required for building a warehouse are counted, even if they may be avoided in exceptional cases. For more information, visit http://www.doingbusiness.org/MethodologySurveys/.