Getting electricity (DB10-15 methodology) - Score in South Korea

South Korea: Getting electricity (DB10-15 methodology) - Score was 99.83 in 2014. ▬ Flat

Latest (2014)
99.83
Change on year
up 0.0%
World rank
1st
of 181 countries
All-time high
99.87
in 2012
All-time low
99.81
in 2013
Years of data
6
2009–2014

Getting electricity (DB10-15 methodology) - Score in South Korea, 2009–2014

0204060801002009201120142009: 99.82010: 99.82011: 99.82012: 99.92013: 99.82014: 99.8

Source: World Bank.

Analysis

South Korea recorded 99.83 for getting electricity (db10-15 methodology) - score in 2014.

Compared with earlier readings it is up 0.0% over ten years.

South Korea ranks 1st of 181 countries on this measure, in the top 10%.

Averages by decade

DecadeAverage LowestHighest Years
2000s 99.82 99.82 99.82 1
2010s 99.84 99.81 99.87 5

Countries ranked near South Korea

  1. 2 Taiwan 98.94 compare
  2. 3 Germany 98.37 compare
  3. 4 United Arab Emirates 97.44 compare

See the full ranking of 183 places →

More private sector data for South Korea

All data for South Korea →

Frequently asked questions

What is getting electricity (db10-15 methodology) - score in South Korea?
Getting electricity (db10-15 methodology) - score in South Korea was 99.83 in 2014, according to the World Bank.
What is the highest getting electricity (db10-15 methodology) - score recorded in South Korea?
The highest recorded value was 99.87 in 2012.
What is the lowest getting electricity (db10-15 methodology) - score recorded in South Korea?
The lowest recorded value was 99.81 in 2013.
How does South Korea rank for getting electricity (db10-15 methodology) - score?
South Korea ranks 1st out of 181 countries with data for 2014.
Is getting electricity (db10-15 methodology) - score rising or falling in South Korea?
Over the last ten years it is up 0.0%. The long-run trend across the full record is flat.
Where does this South Korea data come from?
The figures come from the World Bank, published as part of Getting electricity (DB10-15 methodology) - Score. Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 6 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Getting electricity (DB10-15 methodology) - Score
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
183 places, 1,098 data points, 2009–2014
Last refreshed

The score for getting electricity is the simple average of the scores for each of the component indicators: the procedures, time, cost for a business to obtain a permanent electricity connection and supply for a standardized warehouse, as well as the reliability of supply and transparency of tariffs index. The score is computed based on the methodology in the DB10-15 studies.