Getting electricity (DB10-15 methodology) - Score in Peru
Peru: Getting electricity (DB10-15 methodology) - Score was 73.91 in 2014. ▬ Flat
Getting electricity (DB10-15 methodology) - Score in Peru, 2009–2014
Source: World Bank.
Analysis
The most recent figure for getting electricity (db10-15 methodology) - score in Peru is 73.91, measured in 2014. That is the highest value across all 6 years on record.
That represents a change of up 0.2% on the previous year and up 1.4% over ten years.
Peru ranks 94th of 181 countries on this measure, in the middle of the range.
Averages by decade
| Decade | Average | Lowest | Highest | Years |
|---|---|---|---|---|
| 2000s | 72.9 | 72.9 | 72.9 | 1 |
| 2010s | 73.55 | 72.95 | 73.91 | 5 |
Countries ranked near Peru
More private sector data for Peru
- Merchandise trade 42.8% (2025)
- Food imports 11.9% (2024)
- Manufactures imports 68.2% (2024)
- Merchandise imports 60.63 billion current US$ (2025)
- Food exports 21.2% (2024)
- Manufactures exports 7.4% (2024)
- Merchandise exports 82.69 billion current US$ (2025)
- Commercial service exports 7.45 billion current US$ (2025)
- Transport services 32.3% (2025)
- Computer, communications and other services 34.7% (2025)
Frequently asked questions
- What is getting electricity (db10-15 methodology) - score in Peru?
- Getting electricity (db10-15 methodology) - score in Peru was 73.91 in 2014, according to the World Bank.
- What is the highest getting electricity (db10-15 methodology) - score recorded in Peru?
- The highest recorded value was 73.91 in 2014.
- What is the lowest getting electricity (db10-15 methodology) - score recorded in Peru?
- The lowest recorded value was 72.9 in 2009.
- How does Peru rank for getting electricity (db10-15 methodology) - score?
- Peru ranks 94th out of 181 countries with data for 2014.
- Is getting electricity (db10-15 methodology) - score rising or falling in Peru?
- Over the last ten years it is up 1.4%. The long-run trend across the full record is flat.
- Where does this Peru data come from?
- The figures come from the World Bank, published as part of Getting electricity (DB10-15 methodology) - Score. Statizoid updates them automatically from the source API.
Download this data
CSV · JSON — 6 observations, free to reuse under CC BY 4.0 (World Bank Open Data).
About this data
The score for getting electricity is the simple average of the scores for each of the component indicators: the procedures, time, cost for a business to obtain a permanent electricity connection and supply for a standardized warehouse, as well as the reliability of supply and transparency of tariffs index. The score is computed based on the methodology in the DB10-15 studies.