Getting electricity (DB10-15 methodology) - Score in Suriname
Suriname: Getting electricity (DB10-15 methodology) - Score was 78.68 in 2014. ▬ Flat
Getting electricity (DB10-15 methodology) - Score in Suriname, 2009–2014
Source: World Bank.
Analysis
The most recent figure for getting electricity (db10-15 methodology) - score in Suriname is 78.68, measured in 2014. That is the highest value across all 6 years on record.
The figure is up 0.2% on the previous year and up 5.2% over ten years.
That places Suriname 70th out of 181 countries with data for 2014, putting it in the middle of the range.
Averages by decade
| Decade | Average | Lowest | Highest | Years |
|---|---|---|---|---|
| 2000s | 74.78 | 74.78 | 74.78 | 1 |
| 2010s | 78.13 | 77.4 | 78.68 | 5 |
Countries ranked near Suriname
More private sector data for Suriname
- Merchandise trade 108.1% (2025)
- Food imports 15.5% (2024)
- Manufactures imports 70.7% (2024)
- Merchandise imports 2.20 billion current US$ (2025)
- Food exports 6.4% (2024)
- Manufactures exports 9.1% (2024)
- Merchandise exports 2.69 billion current US$ (2025)
- Commercial service exports 207.79 million current US$ (2025)
- Transport services 5.6% (2025)
- Computer, communications and other services 89.6% (2025)
Frequently asked questions
- What is getting electricity (db10-15 methodology) - score in Suriname?
- Getting electricity (db10-15 methodology) - score in Suriname was 78.68 in 2014, according to the World Bank.
- What is the highest getting electricity (db10-15 methodology) - score recorded in Suriname?
- The highest recorded value was 78.68 in 2014.
- What is the lowest getting electricity (db10-15 methodology) - score recorded in Suriname?
- The lowest recorded value was 74.78 in 2009.
- How does Suriname rank for getting electricity (db10-15 methodology) - score?
- Suriname ranks 70th out of 181 countries with data for 2014.
- Is getting electricity (db10-15 methodology) - score rising or falling in Suriname?
- Over the last ten years it is up 5.2%. The long-run trend across the full record is flat.
- Where does this Suriname data come from?
- The figures come from the World Bank, published as part of Getting electricity (DB10-15 methodology) - Score. Statizoid updates them automatically from the source API.
Download this data
CSV · JSON — 6 observations, free to reuse under CC BY 4.0 (World Bank Open Data).
About this data
The score for getting electricity is the simple average of the scores for each of the component indicators: the procedures, time, cost for a business to obtain a permanent electricity connection and supply for a standardized warehouse, as well as the reliability of supply and transparency of tariffs index. The score is computed based on the methodology in the DB10-15 studies.