Getting electricity (DB10-15 methodology) - Score in Sweden

Sweden: Getting electricity (DB10-15 methodology) - Score was 94.92 in 2014. ▬ Flat

Latest (2014)
94.92
Change on year
up 0.0%
World rank
6th
of 181 countries
All-time high
94.99
in 2009
All-time low
94.91
in 2011
Years of data
6
2009–2014

Getting electricity (DB10-15 methodology) - Score in Sweden, 2009–2014

0204060801002009201120142009: 952010: 952011: 94.92012: 94.92013: 94.92014: 94.9

Source: World Bank.

Analysis

In 2014, getting electricity (db10-15 methodology) - score in Sweden stood at 94.92.

That represents a change of down 0.1% over ten years.

Sweden ranks 6th of 181 countries on this measure, in the top 10%.

Averages by decade

DecadeAverage LowestHighest Years
2000s 94.99 94.99 94.99 1
2010s 94.93 94.91 94.98 5

Countries ranked near Sweden

  1. 3 Germany 98.37 compare
  2. 4 United Arab Emirates 97.44 compare
  3. 5 Switzerland 96.71 compare
  4. 7 Saint Vincent and the Grenadines 94.83 compare
  5. 8 Iceland 93.81 compare
  6. 9 Saint Kitts and Nevis 93.25 compare

See the full ranking of 183 places →

More private sector data for Sweden

All data for Sweden →

Frequently asked questions

What is getting electricity (db10-15 methodology) - score in Sweden?
Getting electricity (db10-15 methodology) - score in Sweden was 94.92 in 2014, according to the World Bank.
What is the highest getting electricity (db10-15 methodology) - score recorded in Sweden?
The highest recorded value was 94.99 in 2009.
What is the lowest getting electricity (db10-15 methodology) - score recorded in Sweden?
The lowest recorded value was 94.91 in 2011.
How does Sweden rank for getting electricity (db10-15 methodology) - score?
Sweden ranks 6th out of 181 countries with data for 2014.
Is getting electricity (db10-15 methodology) - score rising or falling in Sweden?
Over the last ten years it is down 0.1%. The long-run trend across the full record is flat.
Where does this Sweden data come from?
The figures come from the World Bank, published as part of Getting electricity (DB10-15 methodology) - Score. Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 6 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Getting electricity (DB10-15 methodology) - Score
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
183 places, 1,098 data points, 2009–2014
Last refreshed

The score for getting electricity is the simple average of the scores for each of the component indicators: the procedures, time, cost for a business to obtain a permanent electricity connection and supply for a standardized warehouse, as well as the reliability of supply and transparency of tariffs index. The score is computed based on the methodology in the DB10-15 studies.