Getting electricity (DB10-15 methodology) - Score in Syria

Syria: Getting electricity (DB10-15 methodology) - Score was 77.91 in 2014. ▬ Flat

Latest (2014)
77.91
Change on year
down 0.8%
World rank
76th
of 181 countries
All-time high
78.52
in 2013
All-time low
76.9
in 2010
Years of data
6
2009–2014

Getting electricity (DB10-15 methodology) - Score in Syria, 2009–2014

0204060802009201120142009: 77.12010: 76.92011: 77.32012: 77.52013: 78.52014: 77.9

Source: World Bank.

Analysis

The most recent figure for getting electricity (db10-15 methodology) - score in Syria is 77.91, measured in 2014.

That represents a change of down 0.8% on the previous year and up 1.0% over ten years.

Syria ranks 76th of 181 countries on this measure, in the middle of the range.

Averages by decade

DecadeAverage LowestHighest Years
2000s 77.12 77.12 77.12 1
2010s 77.63 76.9 78.52 5

Countries ranked near Syria

  1. 73 Greece 78.26 compare
  2. 74 Indonesia 78.23 compare
  3. 75 Fiji 77.97 compare
  4. 77 Brunei 77.67 compare
  5. 78 Estonia 77.61 compare
  6. 79 Slovakia 77.47 compare

See the full ranking of 183 places →

More private sector data for Syria

All data for Syria →

Frequently asked questions

What is getting electricity (db10-15 methodology) - score in Syria?
Getting electricity (db10-15 methodology) - score in Syria was 77.91 in 2014, according to the World Bank.
What is the highest getting electricity (db10-15 methodology) - score recorded in Syria?
The highest recorded value was 78.52 in 2013.
What is the lowest getting electricity (db10-15 methodology) - score recorded in Syria?
The lowest recorded value was 76.9 in 2010.
How does Syria rank for getting electricity (db10-15 methodology) - score?
Syria ranks 76th out of 181 countries with data for 2014.
Is getting electricity (db10-15 methodology) - score rising or falling in Syria?
Over the last ten years it is up 1.0%. The long-run trend across the full record is flat.
Where does this Syria data come from?
The figures come from the World Bank, published as part of Getting electricity (DB10-15 methodology) - Score. Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 6 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Getting electricity (DB10-15 methodology) - Score
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
183 places, 1,098 data points, 2009–2014
Last refreshed

The score for getting electricity is the simple average of the scores for each of the component indicators: the procedures, time, cost for a business to obtain a permanent electricity connection and supply for a standardized warehouse, as well as the reliability of supply and transparency of tariffs index. The score is computed based on the methodology in the DB10-15 studies.