Getting electricity (DB10-15 methodology) - Score in Syria
Syria: Getting electricity (DB10-15 methodology) - Score was 77.91 in 2014. ▬ Flat
Getting electricity (DB10-15 methodology) - Score in Syria, 2009–2014
Source: World Bank.
Analysis
The most recent figure for getting electricity (db10-15 methodology) - score in Syria is 77.91, measured in 2014.
That represents a change of down 0.8% on the previous year and up 1.0% over ten years.
Syria ranks 76th of 181 countries on this measure, in the middle of the range.
Averages by decade
| Decade | Average | Lowest | Highest | Years |
|---|---|---|---|---|
| 2000s | 77.12 | 77.12 | 77.12 | 1 |
| 2010s | 77.63 | 76.9 | 78.52 | 5 |
Countries ranked near Syria
More private sector data for Syria
- Merchandise trade 79.2% (2025)
- Food imports 21.0% (2010)
- Manufactures imports 54.1% (2010)
- Merchandise imports 7.91 billion current US$ (2025)
- Food exports 21.0% (2010)
- Manufactures exports 24.7% (2010)
- Merchandise exports 3.38 billion current US$ (2025)
- Commercial service exports 7.04 billion current US$ (2010)
- Transport services 46.4% (2010)
- Computer, communications and other services 5.7% (2010)
Frequently asked questions
- What is getting electricity (db10-15 methodology) - score in Syria?
- Getting electricity (db10-15 methodology) - score in Syria was 77.91 in 2014, according to the World Bank.
- What is the highest getting electricity (db10-15 methodology) - score recorded in Syria?
- The highest recorded value was 78.52 in 2013.
- What is the lowest getting electricity (db10-15 methodology) - score recorded in Syria?
- The lowest recorded value was 76.9 in 2010.
- How does Syria rank for getting electricity (db10-15 methodology) - score?
- Syria ranks 76th out of 181 countries with data for 2014.
- Is getting electricity (db10-15 methodology) - score rising or falling in Syria?
- Over the last ten years it is up 1.0%. The long-run trend across the full record is flat.
- Where does this Syria data come from?
- The figures come from the World Bank, published as part of Getting electricity (DB10-15 methodology) - Score. Statizoid updates them automatically from the source API.
Download this data
CSV · JSON — 6 observations, free to reuse under CC BY 4.0 (World Bank Open Data).
About this data
The score for getting electricity is the simple average of the scores for each of the component indicators: the procedures, time, cost for a business to obtain a permanent electricity connection and supply for a standardized warehouse, as well as the reliability of supply and transparency of tariffs index. The score is computed based on the methodology in the DB10-15 studies.