Getting electricity (DB16-20 methodology) - Score in Luxembourg
Luxembourg: Getting electricity (DB16-20 methodology) - Score was 84.31 in 2019. ▬ Flat
Getting electricity (DB16-20 methodology) - Score in Luxembourg, 2014–2019
Source: World Bank.
Analysis
In 2019, getting electricity (db16-20 methodology) - score in Luxembourg stood at 84.31. That is the highest value across all 6 years on record.
The figure is up 0.0% over ten years.
Luxembourg ranks 46th of 188 countries on this measure, in the top quarter.
Countries ranked near Luxembourg
More private sector data for Luxembourg
- Merchandise trade 46.0% (2025)
- Food imports 14.8% (2024)
- Manufactures imports 65.2% (2024)
- Merchandise imports 28.17 billion current US$ (2025)
- Food exports 11.8% (2024)
- Manufactures exports 80.4% (2024)
- Merchandise exports 18.39 billion current US$ (2025)
- Commercial service exports 165.81 billion current US$ (2025)
- Transport services 5.0% (2025)
- Computer, communications and other services 41.4% (2025)
Frequently asked questions
- What is getting electricity (db16-20 methodology) - score in Luxembourg?
- Getting electricity (db16-20 methodology) - score in Luxembourg was 84.31 in 2019, according to the World Bank.
- What is the highest getting electricity (db16-20 methodology) - score recorded in Luxembourg?
- The highest recorded value was 84.31 in 2019.
- What is the lowest getting electricity (db16-20 methodology) - score recorded in Luxembourg?
- The lowest recorded value was 84.29 in 2015.
- How does Luxembourg rank for getting electricity (db16-20 methodology) - score?
- Luxembourg ranks 46th out of 188 countries with data for 2019.
- Is getting electricity (db16-20 methodology) - score rising or falling in Luxembourg?
- Over the last ten years it is up 0.0%. The long-run trend across the full record is flat.
- Where does this Luxembourg data come from?
- The figures come from the World Bank, published as part of Getting electricity (DB16-20 methodology) - Score. Statizoid updates them automatically from the source API.
Download this data
CSV · JSON — 6 observations, free to reuse under CC BY 4.0 (World Bank Open Data).
About this data
The score for getting electricity is the simple average of the scores for each of the component indicators: the procedures, time, cost for a business to obtain a permanent electricity connection and supply for a standardized warehouse, as well as the reliability of supply and transparency of tariffs index. The score is computed based on the methodology in the DB16-20 studies.