Getting electricity (DB16-20 methodology) - Score in Somalia, Fed. Rep.
Somalia, Fed. Rep.: Getting electricity (DB16-20 methodology) - Score was 0 in 2019. ▬ Flat
Getting electricity (DB16-20 methodology) - Score in Somalia, Fed. Rep., 2015–2019
Source: World Bank.
Analysis
In 2019, getting electricity (db16-20 methodology) - score in Somalia, Fed. Rep. stood at 0. That is the highest value across all 5 years on record.
That places Somalia, Fed. Rep. 185th out of 188 countries with data for 2019, putting it in the bottom quarter.
Countries ranked near Somalia, Fed. Rep.
- 182 Burundi 26.45 compare
- 183 Central African Republic 24.64 compare
- 184 Madagascar 24.12 compare
- 185 Eritrea 0 compare
- 185 South Sudan 0 compare
- 185 Yemen, Rep. 0 compare
More private sector data for Somalia, Fed. Rep.
- Merchandise trade 40.2% (2025)
- Food imports 22.4% (1982)
- Manufactures imports 54.7% (1982)
- Merchandise imports 3.93 billion current US$ (2025)
- Food exports 93.7% (1982)
- Manufactures exports 1.3% (1982)
- Merchandise exports 1.30 billion current US$ (2025)
- Merchandise imports from economies in the Arab World 10.9% (2023)
- Merchandise imports from high-income economies 15.8% (2023)
- Merchandise imports from low- and middle-income economies outside regi 75.3% (2023)
Frequently asked questions
- What is getting electricity (db16-20 methodology) - score in Somalia, Fed. Rep.?
- Getting electricity (db16-20 methodology) - score in Somalia, Fed. Rep. was 0 in 2019, according to the World Bank.
- What is the highest getting electricity (db16-20 methodology) - score recorded in Somalia, Fed. Rep.?
- The highest recorded value was 0 in 2015.
- What is the lowest getting electricity (db16-20 methodology) - score recorded in Somalia, Fed. Rep.?
- The lowest recorded value was 0 in 2015.
- How does Somalia, Fed. Rep. rank for getting electricity (db16-20 methodology) - score?
- Somalia, Fed. Rep. ranks 185th out of 188 countries with data for 2019.
- Where does this Somalia, Fed. Rep. data come from?
- The figures come from the World Bank, published as part of Getting electricity (DB16-20 methodology) - Score. Statizoid updates them automatically from the source API.
Download this data
CSV · JSON — 5 observations, free to reuse under CC BY 4.0 (World Bank Open Data).
About this data
The score for getting electricity is the simple average of the scores for each of the component indicators: the procedures, time, cost for a business to obtain a permanent electricity connection and supply for a standardized warehouse, as well as the reliability of supply and transparency of tariffs index. The score is computed based on the methodology in the DB16-20 studies.