Getting electricity (DB16-20 methodology) - Score in South Africa
South Africa: Getting electricity (DB16-20 methodology) - Score was 68.79 in 2019. ▲ Rising
Getting electricity (DB16-20 methodology) - Score in South Africa, 2014–2019
Source: World Bank.
Analysis
The most recent figure for getting electricity (db16-20 methodology) - score in South Africa is 68.79, measured in 2019.
Compared with earlier readings it is up 64.5% over ten years.
That places South Africa 113th out of 188 countries with data for 2019, putting it in the middle of the range.
Countries ranked near South Africa
More private sector data for South Africa
- Merchandise trade 57.2% (2025)
- Food imports 7.2% (2025)
- Manufactures imports 62.1% (2025)
- Merchandise imports 128.08 billion current US$ (2025)
- Food exports 12.8% (2025)
- Manufactures exports 38.3% (2025)
- Merchandise exports 116.40 billion current US$ (2025)
- Commercial service exports 17.80 billion current US$ (2025)
- Transport services 37.0% (2025)
- Computer, communications and other services 44.2% (2025)
Frequently asked questions
- What is getting electricity (db16-20 methodology) - score in South Africa?
- Getting electricity (db16-20 methodology) - score in South Africa was 68.79 in 2019, according to the World Bank.
- What is the highest getting electricity (db16-20 methodology) - score recorded in South Africa?
- The highest recorded value was 68.79 in 2018.
- What is the lowest getting electricity (db16-20 methodology) - score recorded in South Africa?
- The lowest recorded value was 41.81 in 2014.
- How does South Africa rank for getting electricity (db16-20 methodology) - score?
- South Africa ranks 113th out of 188 countries with data for 2019.
- Is getting electricity (db16-20 methodology) - score rising or falling in South Africa?
- Over the last ten years it is up 64.5%. The long-run trend across the full record is rising.
- Where does this South Africa data come from?
- The figures come from the World Bank, published as part of Getting electricity (DB16-20 methodology) - Score. Statizoid updates them automatically from the source API.
Download this data
CSV · JSON — 6 observations, free to reuse under CC BY 4.0 (World Bank Open Data).
About this data
The score for getting electricity is the simple average of the scores for each of the component indicators: the procedures, time, cost for a business to obtain a permanent electricity connection and supply for a standardized warehouse, as well as the reliability of supply and transparency of tariffs index. The score is computed based on the methodology in the DB16-20 studies.