Getting electricity: Procedures in United Arab Emirates

United Arab Emirates: Getting electricity: Procedures was 2 number in 2019. ▼ Falling

Latest (2019)
2 number
Change on year
unchanged
World rank
181st
of 186 countries
All-time high
4 number
in 2009
All-time low
2 number
in 2017
Years of data
11
2009–2019

Getting electricity: Procedures in United Arab Emirates, 2009–2019

012342009201420192009: 4 number2010: 4 number2011: 4 number2012: 4 number2013: 3 number2014: 3 number2015: 3 number2016: 3 number2017: 2 number2018: 2 number2019: 2 number

Source: World Bank. Measured in number.

Analysis

The most recent figure for getting electricity: procedures in United Arab Emirates is 2 number, measured in 2019. That is the lowest value across all 11 years on record.

The figure is down 50.0% over ten years.

Over the whole period, getting electricity: procedures in United Arab Emirates peaked at 4 number in 2009 and was at its lowest, 2 number, in 2017.

That places United Arab Emirates 181st out of 186 countries with data for 2019, putting it in the bottom quarter.

The long-run direction has been consistently falling across the 11 years of available data.

Averages by decade

DecadeAverage LowestHighest Years
2000s 4 number 4 number 4 number 1
2010s 3 number 2 number 4 number 10

Countries ranked near United Arab Emirates

  1. 180 Japan 2.35 number compare
  2. 181 China 2 number compare
  3. 181 Russia 2 number compare
  4. 181 Armenia 2 number compare
  5. 181 Saudi Arabia 2 number compare
  6. 181 Thailand 2 number compare

See the full ranking of 188 places →

More private sector data for United Arab Emirates

All data for United Arab Emirates →

Frequently asked questions

What is getting electricity: procedures in United Arab Emirates?
Getting electricity: procedures in United Arab Emirates was 2 number in 2019, according to the World Bank.
What is the highest getting electricity: procedures recorded in United Arab Emirates?
The highest recorded value was 4 number in 2009.
What is the lowest getting electricity: procedures recorded in United Arab Emirates?
The lowest recorded value was 2 number in 2017.
How does United Arab Emirates rank for getting electricity: procedures?
United Arab Emirates ranks 181st out of 186 countries with data for 2019.
Is getting electricity: procedures rising or falling in United Arab Emirates?
Over the last ten years it is down 50.0%. The long-run trend across the full record is falling.
Where does this United Arab Emirates data come from?
The figures come from the World Bank, published as part of Getting electricity: Procedures (number). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 11 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Getting electricity: Procedures (number)
Unit
number
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,045 data points, 2009–2019
Last refreshed

The number of procedures records all the procedures required in practice for businesses to obtain a new electrical connection. A procedure is defined as any interaction of the company’s employees or its main electrician or electrical engineer with external parties, such as the electricity distribution utility, electricity supply utilities, government agencies, electrical contractors and firms. Interactions between company employees and steps related to the internal electrical wiring, such as the design and execution of the internal electrical installation plans, are not counted as procedures. However, internal wiring inspections and certifications that are prerequisites to obtain a new connection are counted as procedures.