Getting electricity: Total duration and frequency of outages per in Philippines
Philippines: Getting electricity: Total duration and frequency of outages per was 2 DB16-20 methodology in 2019. ▲ Rising
Getting electricity: Total duration and frequency of outages per in Philippines, 2014–2019
Source: World Bank. Measured in DB16-20 methodology.
Analysis
In 2019, getting electricity: total duration and frequency of outages per in Philippines stood at 2 DB16-20 methodology. That is the highest value across all 6 years on record.
The figure is up 100.0% over ten years.
Philippines ranks 48th of 187 countries on this measure, in the middle of the range.
Getting electricity: Total duration and frequency of outages per in Philippines, year by year
| Year | DB16-20 methodology | Change |
|---|---|---|
| 2014 | 1 DB16-20 methodology | — |
| 2015 | 1 DB16-20 methodology | +0.0% |
| 2016 | 1 DB16-20 methodology | +0.0% |
| 2017 | 1 DB16-20 methodology | +0.0% |
| 2018 | 2 DB16-20 methodology | +100.0% |
| 2019 | 2 DB16-20 methodology | +0.0% |
Countries ranked near Philippines
- 47 United States 2.6 DB16-20 methodology compare
- 48 Indonesia 2 DB16-20 methodology compare
- 48 Antigua and Barbuda 2 DB16-20 methodology compare
- 48 Australia 2 DB16-20 methodology compare
- 48 Bosnia and Herzegovina 2 DB16-20 methodology compare
- 48 Canada 2 DB16-20 methodology compare
- 48 Chile 2 DB16-20 methodology compare
- 48 Croatia 2 DB16-20 methodology compare
- 48 Ecuador 2 DB16-20 methodology compare
- 48 Egypt 2 DB16-20 methodology compare
- 48 Greece 2 DB16-20 methodology compare
- 48 Guatemala 2 DB16-20 methodology compare
- 48 Hungary 2 DB16-20 methodology compare
- 48 Israel 2 DB16-20 methodology compare
- 48 Italy 2 DB16-20 methodology compare
- 48 Jordan 2 DB16-20 methodology compare
- 48 Malta 2 DB16-20 methodology compare
- 48 Mauritius 2 DB16-20 methodology compare
- 48 Republic of Moldova 2 DB16-20 methodology compare
- 48 Morocco 2 DB16-20 methodology compare
- 48 New Zealand 2 DB16-20 methodology compare
- 48 Norway 2 DB16-20 methodology compare
- 48 Oman 2 DB16-20 methodology compare
- 48 Poland 2 DB16-20 methodology compare
- 48 Romania 2 DB16-20 methodology compare
- 48 Saudi Arabia 2 DB16-20 methodology compare
- 48 Serbia 2 DB16-20 methodology compare
- 48 Solomon Islands 2 DB16-20 methodology compare
- 48 Sri Lanka 2 DB16-20 methodology compare
- 48 Tajikistan 2 DB16-20 methodology compare
- 48 Tunisia 2 DB16-20 methodology compare
- 48 Ukraine 2 DB16-20 methodology compare
- 48 Viet Nam 2 DB16-20 methodology compare
More private sector data for Philippines
- Merchandise trade 46.2% (2025)
- Food imports 15.0% (2024)
- Manufactures imports 65.2% (2024)
- Merchandise imports 141.20 billion current US$ (2025)
- Food exports 10.4% (2024)
- Manufactures exports 77.2% (2024)
- Merchandise exports 83.72 billion current US$ (2025)
- Merchandise exports (current US$), per capita 716.89 current US$ per person (2025)
- Merchandise exports (current US$), per unit of GDP 0.1719 current US$ per US$ of GDP (2025)
- Merchandise exports (current US$), annual growth rate 14.71 % change on previous year (2025)
Frequently asked questions
- What is getting electricity: total duration and frequency of outages per in Philippines?
- Getting electricity: total duration and frequency of outages per in Philippines was 2 DB16-20 methodology in 2019, according to the World Bank.
- What is the highest getting electricity: total duration and frequency of outages per recorded in Philippines?
- The highest recorded value was 2 DB16-20 methodology in 2018.
- What is the lowest getting electricity: total duration and frequency of outages per recorded in Philippines?
- The lowest recorded value was 1 DB16-20 methodology in 2014.
- How does Philippines rank for getting electricity: total duration and frequency of outages per?
- Philippines ranks 48th out of 187 countries with data for 2019.
- Is getting electricity: total duration and frequency of outages per rising or falling in Philippines?
- Over the last ten years it is up 100.0%. The long-run trend across the full record is rising.
- Where does this Philippines data come from?
- The figures come from the World Bank, published as part of Getting electricity: Total duration and frequency of outages per customer a year (0-3) (DB16-20 methodology). Statizoid updates them automatically from the source API.
Download this data
CSV · JSON — 6 observations, free to reuse under CC BY 4.0 (World Bank Open Data).
About this data
The total duration and frequency of outages per customer a year index evaluates the quality of the power supply. If SAIDI and SAIFI are 12 (equivalent to an outage of one hour each month) or below, a score of 1 is assigned. If SAIDI and SAIFI are 4 (equivalent to an outage of one hour each quarter) or below, 1 additional point is assigned. If SAIDI and SAIFI are 1 (equivalent to an outage of one hour per year) or below, 1 more point is assigned. The index is computed based on the methodology in the DB16-20 studies.