{"entity":{"iso2":"A9","iso3":"AFR","name":"Africa","slug":"africa"},"indicator":{"licence":"CC BY 4.0 (World Bank Open Data)","slug":"time-required-to-deal-with-construction-permits-days","source":"World Bank, Doing Business project (http://www.doingbusiness.org/)","source_url":"https://data.worldbank.org/indicator/IC.FRM.TIME","title":"Time required to deal with construction permits (days)","unit":"days"},"observations":[{"date":"2005-01-01","value":219.408},{"date":"2006-01-01","value":223.08},{"date":"2007-01-01","value":221.88},{"date":"2008-01-01","value":220.68},{"date":"2009-01-01","value":210.54},{"date":"2010-01-01","value":199.58},{"date":"2011-01-01","value":195.6},{"date":"2012-01-01","value":193.58}],"summary":{"latest_period":"2012-01-01","latest_value":193.58,"max":223.08,"mean":210.544,"min":193.58,"of":6,"rank":5,"trend":"falling"}}