{"entity":{"iso2":"BJ","iso3":"BEN","name":"Benin","slug":"benin"},"indicator":{"licence":"CC BY 4.0 (World Bank Open Data)","slug":"time-required-to-deal-with-construction-permits-days","source":"World Bank, Doing Business project (http://www.doingbusiness.org/)","source_url":"https://data.worldbank.org/indicator/IC.FRM.TIME","title":"Time required to deal with construction permits (days)","unit":"days"},"observations":[{"date":"2005-01-01","value":384.0},{"date":"2006-01-01","value":384.0},{"date":"2007-01-01","value":384.0},{"date":"2008-01-01","value":462.0},{"date":"2009-01-01","value":462.0},{"date":"2010-01-01","value":372.0},{"date":"2011-01-01","value":372.0},{"date":"2012-01-01","value":282.0}],"summary":{"latest_period":"2012-01-01","latest_value":282.0,"max":462.0,"mean":387.75,"min":282.0,"of":50,"rank":8,"trend":"falling"}}