{"entity":{"iso2":"BW","iso3":"BWA","name":"Botswana","slug":"botswana"},"indicator":{"licence":"CC BY 4.0 (World Bank Open Data)","slug":"time-required-to-deal-with-construction-permits-days","source":"World Bank, Doing Business project (http://www.doingbusiness.org/)","source_url":"https://data.worldbank.org/indicator/IC.FRM.TIME","title":"Time required to deal with construction permits (days)","unit":"days"},"observations":[{"date":"2005-01-01","value":115.0},{"date":"2006-01-01","value":145.0},{"date":"2007-01-01","value":145.0},{"date":"2008-01-01","value":145.0},{"date":"2009-01-01","value":145.0},{"date":"2010-01-01","value":145.0},{"date":"2011-01-01","value":145.0},{"date":"2012-01-01","value":145.0}],"summary":{"latest_period":"2012-01-01","latest_value":145.0,"max":145.0,"mean":141.25,"min":115.0,"of":50,"rank":30,"trend":"rising"}}