{"entity":{"iso2":"LR","iso3":"LBR","name":"Liberia","slug":"liberia"},"indicator":{"licence":"CC BY 4.0 (World Bank Open Data)","slug":"time-required-to-deal-with-construction-permits-days","source":"World Bank, Doing Business project (http://www.doingbusiness.org/)","source_url":"https://data.worldbank.org/indicator/IC.FRM.TIME","title":"Time required to deal with construction permits (days)","unit":"days"},"observations":[{"date":"2006-01-01","value":424.0},{"date":"2007-01-01","value":424.0},{"date":"2008-01-01","value":347.0},{"date":"2009-01-01","value":75.0},{"date":"2010-01-01","value":75.0},{"date":"2011-01-01","value":75.0},{"date":"2012-01-01","value":75.0}],"summary":{"latest_period":"2012-01-01","latest_value":75.0,"max":424.0,"mean":213.571,"min":75.0,"of":50,"rank":50,"trend":"volatile"}}
