Benin vs Congo: Dealing with construction permits: Building quality control index (0-1

Benin
9 DB16-20 methodology
in 2019
Congo
9.5 DB16-20 methodology
in 2019
Benin rank
123rd
Congo rank
120th

Dealing with construction permits: Building quality control index (0-1 over time

  • Benin
  • Congo
0246810201420162019

How they compare

Congo currently reports 9.5 DB16-20 methodology against 9 DB16-20 methodology in Benin, a difference of 0.5 DB16-20 methodology.

That makes Congo's figure about 1.1 times Benin's.

Across all 6 years both countries report, Congo has been ahead every year.

Benin ranks 123rd and Congo ranks 120th of 183 countries.

Congo has averaged higher in every one of the 1 decades both report.

Frequently asked questions

Which has higher dealing with construction permits: building quality control index (0-1, Benin or Congo?
Congo, at 9.5 DB16-20 methodology against 9 DB16-20 methodology in Benin as of 2019.
What is the difference in dealing with construction permits: building quality control index (0-1 between Benin and Congo?
0.5 DB16-20 methodology, with Congo ahead.
How many years of comparable data are there for Benin and Congo?
6 years are reported by both, from 2014 to 2019.
How do Benin and Congo rank globally for dealing with construction permits: building quality control index (0-1?
Benin ranks 123rd and Congo ranks 120th of 183 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Building quality control index (0-15) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Dealing with construction permits: Building quality control index (0-15) (DB16-20 methodology)
Unit
DB16-20 methodology
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
185 places, 1,109 data points, 2014–2019
Last refreshed

The building quality control index is the sum of the following six indices: quality of building regulations, quality control before construction, quality control during construction, quality control after construction, liability and insurance regimes and professional certifications. The component indicator is computed based on the methodology in the DB16-20 studies.