Dealing with construction … Dealing 0-15 Building control in Congo
Congo: Dealing with construction permits: Building quality control index was 9.5 DB16-20 methodology in 2019. ▬ Flat
Dealing with construction permits: Building quality control index in Congo, 2014–2019
Source: World Bank. Measured in DB16-20 methodology.
Analysis
In 2019, dealing with construction permits: building quality control index in Congo stood at 9.5 DB16-20 methodology. That is the highest value across all 6 years on record.
Compared with earlier readings it is unchanged over ten years.
That places Congo 121st out of 186 countries with data for 2019, putting it in the middle of the range.
Dealing with construction permits: Building quality control index in Congo, year by year
| Year | DB16-20 methodology | Change |
|---|---|---|
| 2014 | 9.5 DB16-20 methodology | — |
| 2015 | 9.5 DB16-20 methodology | +0.0% |
| 2016 | 9.5 DB16-20 methodology | +0.0% |
| 2017 | 9.5 DB16-20 methodology | +0.0% |
| 2018 | 9.5 DB16-20 methodology | +0.0% |
| 2019 | 9.5 DB16-20 methodology | +0.0% |
Congo compared with similar countries
- Congo's 9.5 DB16-20 methodology is below the median for lower middle income countries, which is 10 DB16-20 methodology, 95% of the median. (47 countries reporting)
- Congo's 9.5 DB16-20 methodology is below the median for Sub-Saharan Africa, which is 9.75 DB16-20 methodology, 97% of the median. (46 countries reporting)
Countries ranked near Congo
- 121 Germany 9.5 DB16-20 methodology compare
- 121 Malawi 9.5 DB16-20 methodology compare
- 124 Antigua and Barbuda 9 DB16-20 methodology compare
- 124 Benin 9 DB16-20 methodology compare
- 124 Georgia 9 DB16-20 methodology compare
- 124 Honduras 9 DB16-20 methodology compare
- 124 Kosovo 9 DB16-20 methodology compare
- 124 Panama 9 DB16-20 methodology compare
- 124 Sweden 9 DB16-20 methodology compare
- 124 Switzerland 9 DB16-20 methodology compare
- 124 United Kingdom 9 DB16-20 methodology compare
- 124 Uruguay 9 DB16-20 methodology compare
- 124 Kosovo (UNSCR 1244) 9 DB16-20 methodology compare
More private sector data for Congo
- Merchandise trade 94.4% (2025)
- Food imports 21.2% (2023)
- Manufactures imports 71.4% (2023)
- Merchandise imports 7.90 billion current US$ (2025)
- Food exports 0.2% (2023)
- Manufactures exports 10.3% (2023)
- Merchandise exports 7.50 billion current US$ (2025)
- Merchandise exports (current US$), per capita 1,157 current US$ per person (2025)
- Merchandise exports (current US$), per unit of GDP 0.4599 current US$ per US$ of GDP (2025)
- Merchandise exports (current US$), annual growth rate -4.57 % change on previous year (2025)
Frequently asked questions
- What is dealing with construction permits: building quality control index in Congo?
- Dealing with construction permits: building quality control index in Congo was 9.5 DB16-20 methodology in 2019, according to the World Bank.
- What is the highest dealing with construction permits: building quality control index recorded in Congo?
- The highest recorded value was 9.5 DB16-20 methodology in 2014.
- What is the lowest dealing with construction permits: building quality control index recorded in Congo?
- The lowest recorded value was 9.5 DB16-20 methodology in 2014.
- How does Congo rank for dealing with construction permits: building quality control index?
- Congo ranks 121st out of 186 countries with data for 2019.
- Is dealing with construction permits: building quality control index rising or falling in Congo?
- Over the last ten years it is unchanged. The long-run trend across the full record is flat.
- Where does this Congo data come from?
- The figures come from the World Bank, published as part of Dealing with construction permits: Building quality control index (0-15) (DB16-20 methodology). Statizoid updates them automatically from the source API.
Download this data
CSV · JSON — 6 observations, free to reuse under CC BY 4.0 (World Bank Open Data).
About this data
The building quality control index is the sum of the following six indices: quality of building regulations, quality control before construction, quality control during construction, quality control after construction, liability and insurance regimes and professional certifications. The component indicator is computed based on the methodology in the DB16-20 studies.