Congo, Democratic Republic of the vs Nepal: Dealing with construction permits: Building quality control index
Congo, Democratic Republic of the
10 DB16-20 methodology
in 2019
Nepal
10 DB16-20 methodology
in 2019
Congo, Democratic Republic of the rank
105th
Nepal rank
105th
Dealing with construction permits: Building quality control index over time
- Congo, Democratic Republic of the
- Nepal
How they compare
Congo, Democratic Republic of the currently reports 10 DB16-20 methodology against 10 DB16-20 methodology in Nepal, a difference of 0 DB16-20 methodology.
Across all 6 years both countries report, Nepal has been ahead every year.
Congo, Democratic Republic of the ranks 105th and Nepal ranks 105th of 185 countries.
Nepal has averaged higher in every one of the 1 decades both report.
Frequently asked questions
- Which has higher dealing with construction permits: building quality control index, Congo, Democratic Republic of the or Nepal?
- Congo, Democratic Republic of the, at 10 DB16-20 methodology against 10 DB16-20 methodology in Nepal as of 2019.
- What is the difference in dealing with construction permits: building quality control index between Congo, Democratic Republic of the and Nepal?
- 0 DB16-20 methodology, with Congo, Democratic Republic of the ahead.
- How many years of comparable data are there for Congo, Democratic Republic of the and Nepal?
- 6 years are reported by both, from 2014 to 2019.
- How do Congo, Democratic Republic of the and Nepal rank globally for dealing with construction permits: building quality control index?
- Congo, Democratic Republic of the ranks 105th and Nepal ranks 105th of 185 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Building quality control index (0-15) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The building quality control index is the sum of the following six indices: quality of building regulations, quality control before construction, quality control during construction, quality control after construction, liability and insurance regimes and professional certifications. The component indicator is computed based on the methodology in the DB16-20 studies.