Dealing with construction permits: Building quality control index (0-1 in Democratic Republic of Congo

Democratic Republic of Congo: Dealing with construction permits: Building quality control index (0-1 was 10 DB16-20 methodology in 2019. ▲ Rising

Latest (2019)
10 DB16-20 methodology
Change on year
up 42.9%
World rank
104th
of 183 countries
All-time high
10 DB16-20 methodology
in 2019
All-time low
4.5 DB16-20 methodology
in 2014
Years of data
6
2014–2019

Dealing with construction permits: Building quality control index (0-1 in Democratic Republic of Congo, 2014–2019

02468102014201620192014: 4.5 DB16-20 methodology2015: 4.5 DB16-20 methodology2016: 6.5 DB16-20 methodology2017: 7 DB16-20 methodology2018: 7 DB16-20 methodology2019: 10 DB16-20 methodology

Source: World Bank. Measured in DB16-20 methodology.

Analysis

Democratic Republic of Congo recorded 10 DB16-20 methodology for dealing with construction permits: building quality control index (0-1 in 2019. That is the highest value across all 6 years on record.

The figure is up 42.9% on the previous year and up 122.2% over ten years.

That places Democratic Republic of Congo 104th out of 183 countries with data for 2019, putting it in the middle of the range.

Countries ranked near Democratic Republic of Congo

  1. 101 Botswana 10.5 DB16-20 methodology compare
  2. 101 Saint Lucia 10.5 DB16-20 methodology compare
  3. 101 Venezuela 10.5 DB16-20 methodology compare
  4. 104 Bangladesh 10 DB16-20 methodology compare
  5. 104 Cote d'Ivoire 10 DB16-20 methodology compare
  6. 104 El Salvador 10 DB16-20 methodology compare
  7. 104 Finland 10 DB16-20 methodology compare
  8. 104 Kenya 10 DB16-20 methodology compare
  9. 104 Montenegro 10 DB16-20 methodology compare
  10. 104 Nepal 10 DB16-20 methodology compare
  11. 104 Netherlands 10 DB16-20 methodology compare
  12. 104 Papua New Guinea 10 DB16-20 methodology compare
  13. 104 Poland 10 DB16-20 methodology compare
  14. 104 Senegal 10 DB16-20 methodology compare
  15. 104 Tonga 10 DB16-20 methodology compare
  16. 104 Trinidad and Tobago 10 DB16-20 methodology compare
  17. 104 Zambia 10 DB16-20 methodology compare
  18. 104 Zimbabwe 10 DB16-20 methodology compare

See the full ranking of 185 places →

More private sector data for Democratic Republic of Congo

All data for Democratic Republic of Congo →

Frequently asked questions

What is dealing with construction permits: building quality control index (0-1 in Democratic Republic of Congo?
Dealing with construction permits: building quality control index (0-1 in Democratic Republic of Congo was 10 DB16-20 methodology in 2019, according to the World Bank.
What is the highest dealing with construction permits: building quality control index (0-1 recorded in Democratic Republic of Congo?
The highest recorded value was 10 DB16-20 methodology in 2019.
What is the lowest dealing with construction permits: building quality control index (0-1 recorded in Democratic Republic of Congo?
The lowest recorded value was 4.5 DB16-20 methodology in 2014.
How does Democratic Republic of Congo rank for dealing with construction permits: building quality control index (0-1?
Democratic Republic of Congo ranks 104th out of 183 countries with data for 2019.
Is dealing with construction permits: building quality control index (0-1 rising or falling in Democratic Republic of Congo?
Over the last ten years it is up 122.2%. The long-run trend across the full record is rising.
Where does this Democratic Republic of Congo data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Building quality control index (0-15) (DB16-20 methodology). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 6 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Dealing with construction permits: Building quality control index (0-15) (DB16-20 methodology)
Unit
DB16-20 methodology
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
185 places, 1,109 data points, 2014–2019
Last refreshed

The building quality control index is the sum of the following six indices: quality of building regulations, quality control before construction, quality control during construction, quality control after construction, liability and insurance regimes and professional certifications. The component indicator is computed based on the methodology in the DB16-20 studies.