Congo, Democratic Republic of the vs Venezuela, Bolivarian Republic of: Dealing with construction permits: Building quality control index
Dealing with construction permits: Building quality control index over time
- Congo, Democratic Republic of the
- Venezuela, Bolivarian Republic of
How they compare
Venezuela, Bolivarian Republic of currently reports 10.5 DB16-20 methodology against 10 DB16-20 methodology in Congo, Democratic Republic of the, a difference of 0.5 DB16-20 methodology.
That makes Venezuela, Bolivarian Republic of's figure about 1.1 times Congo, Democratic Republic of the's.
Across all 6 years both countries report, Venezuela, Bolivarian Republic of has been ahead every year.
Congo, Democratic Republic of the ranks 105th and Venezuela, Bolivarian Republic of ranks 102nd of 186 countries.
Venezuela, Bolivarian Republic of has averaged higher in every one of the 1 decades both report.
Frequently asked questions
- Which has higher dealing with construction permits: building quality control index, Congo, Democratic Republic of the or Venezuela, Bolivarian Republic of?
- Venezuela, Bolivarian Republic of, at 10.5 DB16-20 methodology against 10 DB16-20 methodology in Congo, Democratic Republic of the as of 2019.
- What is the difference in dealing with construction permits: building quality control index between Congo, Democratic Republic of the and Venezuela, Bolivarian Republic of?
- 0.5 DB16-20 methodology, with Venezuela, Bolivarian Republic of ahead.
- How many years of comparable data are there for Congo, Democratic Republic of the and Venezuela, Bolivarian Republic of?
- 6 years are reported by both, from 2014 to 2019.
- How do Congo, Democratic Republic of the and Venezuela, Bolivarian Republic of rank globally for dealing with construction permits: building quality control index?
- Congo, Democratic Republic of the ranks 105th and Venezuela, Bolivarian Republic of ranks 102nd of 186 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Building quality control index (0-15) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The building quality control index is the sum of the following six indices: quality of building regulations, quality control before construction, quality control during construction, quality control after construction, liability and insurance regimes and professional certifications. The component indicator is computed based on the methodology in the DB16-20 studies.