Kiribati vs Samoa: Dealing with construction permits: Building quality control index

Kiribati
6 DB16-20 methodology
in 2019
Samoa
6 DB16-20 methodology
in 2019
Kiribati rank
162nd
Samoa rank
162nd

Dealing with construction permits: Building quality control index over time

  • Kiribati
  • Samoa
0246201420162019

How they compare

Kiribati currently reports 6 DB16-20 methodology against 6 DB16-20 methodology in Samoa, a difference of 0 DB16-20 methodology.

Across all 6 years both countries report, Samoa has been ahead every year.

Kiribati ranks 162nd and Samoa ranks 162nd of 185 countries.

Frequently asked questions

Which has higher dealing with construction permits: building quality control index, Kiribati or Samoa?
Kiribati, at 6 DB16-20 methodology against 6 DB16-20 methodology in Samoa as of 2019.
What is the difference in dealing with construction permits: building quality control index between Kiribati and Samoa?
0 DB16-20 methodology, with Kiribati ahead.
How many years of comparable data are there for Kiribati and Samoa?
6 years are reported by both, from 2014 to 2019.
How do Kiribati and Samoa rank globally for dealing with construction permits: building quality control index?
Kiribati ranks 162nd and Samoa ranks 162nd of 185 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Building quality control index (0-15) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Kiribati vs Samoa: Dealing with construction permits: Building quality control index. Statizoid. Retrieved 19 August 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-building-quality-control-index-0-15-db16-20-methodology-2/kiribati/samoa/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-building-quality-control-index-0-15-db16-20-methodology-2/kiribati/samoa/">Kiribati vs Samoa: Dealing with construction permits: Building quality control index</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Building quality control index (0-15) (DB16-20 methodology)
Unit
DB16-20 methodology
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
185 places, 1,109 data points, 2014–2019
Last refreshed

The building quality control index is the sum of the following six indices: quality of building regulations, quality control before construction, quality control during construction, quality control after construction, liability and insurance regimes and professional certifications. The component indicator is computed based on the methodology in the DB16-20 studies.