Dealing with construction permits: Building quality control index in Kiribati

Kiribati: Dealing with construction permits: Building quality control index was 6 DB16-20 methodology in 2019. ▬ Flat

Latest (2019)
6 DB16-20 methodology
Change on year
unchanged
World rank
162nd
of 185 countries
All-time high
6 DB16-20 methodology
in 2014
All-time low
6 DB16-20 methodology
in 2014
Years of data
6
2014–2019

Dealing with construction permits: Building quality control index in Kiribati, 2014–2019

02462014201620192014: 6 DB16-20 methodology2015: 6 DB16-20 methodology2016: 6 DB16-20 methodology2017: 6 DB16-20 methodology2018: 6 DB16-20 methodology2019: 6 DB16-20 methodology

Source: World Bank. Measured in DB16-20 methodology.

Analysis

Kiribati recorded 6 DB16-20 methodology for dealing with construction permits: building quality control index in 2019. That is the highest value across all 6 years on record.

Compared with earlier readings it is unchanged over ten years.

Kiribati ranks 162nd of 185 countries on this measure, in the bottom quarter.

Countries ranked near Kiribati

  1. 159 Barbados 6.5 DB16-20 methodology compare
  2. 159 Lao People’s Democratic Republic 6.5 DB16-20 methodology compare
  3. 159 Suriname 6.5 DB16-20 methodology compare
  4. 162 Angola 6 DB16-20 methodology compare
  5. 162 Central African Republic 6 DB16-20 methodology compare
  6. 162 Madagascar 6 DB16-20 methodology compare
  7. 162 Samoa 6 DB16-20 methodology compare
  8. 162 Seychelles 6 DB16-20 methodology compare
  9. 162 Sri Lanka 6 DB16-20 methodology compare

See the full ranking of 185 places →

More private sector data for Kiribati

All data for Kiribati →

Frequently asked questions

What is dealing with construction permits: building quality control index in Kiribati?
Dealing with construction permits: building quality control index in Kiribati was 6 DB16-20 methodology in 2019, according to the World Bank.
What is the highest dealing with construction permits: building quality control index recorded in Kiribati?
The highest recorded value was 6 DB16-20 methodology in 2014.
What is the lowest dealing with construction permits: building quality control index recorded in Kiribati?
The lowest recorded value was 6 DB16-20 methodology in 2014.
How does Kiribati rank for dealing with construction permits: building quality control index?
Kiribati ranks 162nd out of 185 countries with data for 2019.
Is dealing with construction permits: building quality control index rising or falling in Kiribati?
Over the last ten years it is unchanged. The long-run trend across the full record is flat.
Where does this Kiribati data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Building quality control index (0-15) (DB16-20 methodology). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 6 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

Share, cite or embed this page

Cite this page

Dealing with construction permits: Building quality control index in Kiribati. Statizoid. Retrieved 17 August 2026, from https://private-sector.statizoid.com/stat/dealing-with-construction-permits-building-quality-control-index-0-15-db16-20-methodology-2/kiribati/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/stat/dealing-with-construction-permits-building-quality-control-index-0-15-db16-20-methodology-2/kiribati/">Dealing with construction permits: Building quality control index in Kiribati</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Building quality control index (0-15) (DB16-20 methodology)
Unit
DB16-20 methodology
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
185 places, 1,109 data points, 2014–2019
Last refreshed

The building quality control index is the sum of the following six indices: quality of building regulations, quality control before construction, quality control during construction, quality control after construction, liability and insurance regimes and professional certifications. The component indicator is computed based on the methodology in the DB16-20 studies.