Angola vs Benin: Dealing with construction permits, cost
Dealing with construction permits, cost over time
- Angola
- Benin
How they compare
Benin currently reports 167.4% against 153.6% in Angola, a difference of 13.8%.
That makes Benin's figure about 1.1 times Angola's.
The two have swapped places 1 time across 8 shared years of data; in 2005 it was Angola ahead.
Angola ranks 37th and Benin ranks 35th of 50 countries.
Angola has averaged higher in every one of the 2 decades both report.
Head to head by decade
| Decade | Angola | Benin | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 407.0% | 182.1% | 224.9% | Angola |
| 2010s | 197.6% | 161.6% | 36.0% | Angola |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher dealing with construction permits, cost, Angola or Benin?
- Benin, at 167.4% against 153.6% in Angola as of 2012.
- What is the difference in dealing with construction permits, cost between Angola and Benin?
- 13.8%, with Benin ahead.
- How many years of comparable data are there for Angola and Benin?
- 8 years are reported by both, from 2005 to 2012.
- How do Angola and Benin rank globally for dealing with construction permits, cost?
- Angola ranks 37th and Benin ranks 35th of 50 countries.
- Where does this data come from?
- World Bank, Doing Business project (http://www.doingbusiness.org/), published as Dealing with construction permits, cost (% of income per capita). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
Cost is recorded as a percentage of the economy’s income per capita. Only official costs are recorded. All the fees associated with completing the procedures to legally build a warehouse are recorded, including those associated with obtaining land use approvals and preconstruction design clearances; receiving inspections before, during and after construction; getting utility connections; and registering the warehouse property. Nonrecurring taxes required for the completion of the warehouse project also are recorded. The building code, information from local experts and specific regulations and fee schedules are used as sources for costs. If several local partners provide different estimates, the median reported value is used.