Dealing with construction permits, cost in Benin

Benin: Dealing with construction permits, cost was 167.4% in 2012. ▼ Falling

Latest (2012)
167.4%
Change on year
up 26.2%
World rank
35th
of 50 countries
All-time high
202.3%
in 2008
All-time low
132.6%
in 2011
Years of data
8
2005–2012

Dealing with construction permits, cost in Benin, 2005–2012

0501001502002005200820122005: 158.9 % of income per capita2006: 186.5 % of income per capita2007: 174.2 % of income per capita2008: 202.3 % of income per capita2009: 188.4 % of income per capita2010: 184.9 % of income per capita2011: 132.6 % of income per capita2012: 167.4 % of income per capita

Source: World Bank, Doing Business project (http://www.doingbusiness.org/). Measured in % of income per capita.

Analysis

Benin recorded 167.4% for dealing with construction permits, cost in 2012.

Compared with earlier readings it is up 26.2% on the previous year and up 5.3% over ten years.

That places Benin 35th out of 50 countries with data for 2012, putting it in the middle of the range.

Dealing with construction permits, cost in Benin, year by year

Annual values for Dealing with construction permits, cost (% of income per capita) in Benin, 2005 to 2012.
Year % of income per capita Change
2005 158.9%
2006 186.5% +17.4%
2007 174.2% -6.6%
2008 202.3% +16.1%
2009 188.4% -6.9%
2010 184.9% -1.9%
2011 132.6% -28.3%
2012 167.4% +26.2%

Averages by decade

DecadeAverage LowestHighest Years
2000s 182.1% 158.9% 202.3% 5
2010s 161.6% 132.6% 184.9% 3

Countries ranked near Benin

  1. 32 Kenya 211.9% compare
  2. 33 Central African Republic 194.0% compare
  3. 34 Botswana 172.7% compare
  4. 36 Cote d'Ivoire 155.1% compare
  5. 37 Angola 153.6% compare
  6. 38 Egypt 135.0% compare

See the full ranking of 56 places →

More private sector data for Benin

All data for Benin →

Frequently asked questions

What is dealing with construction permits, cost in Benin?
Dealing with construction permits, cost in Benin was 167.4% in 2012, according to World Bank, Doing Business project (http://www.doingbusiness.org/).
What is the highest dealing with construction permits, cost recorded in Benin?
The highest recorded value was 202.3% in 2008.
What is the lowest dealing with construction permits, cost recorded in Benin?
The lowest recorded value was 132.6% in 2011.
How does Benin rank for dealing with construction permits, cost?
Benin ranks 35th out of 50 countries with data for 2012.
Is dealing with construction permits, cost rising or falling in Benin?
Over the last ten years it is up 5.3%. The long-run trend across the full record is falling.
Where does this Benin data come from?
The figures come from World Bank, Doing Business project (http://www.doingbusiness.org/), published as part of Dealing with construction permits, cost (% of income per capita). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 8 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

Share, cite or embed this page

Cite this page

Dealing with construction permits, cost in Benin. Statizoid, drawing on World Bank, Doing Business project (http://www.doingbusiness.org/). Retrieved 01 September 2026, from https://private-sector.statizoid.com/stat/dealing-with-construction-permits-cost-percent-of-income-per-capita/benin/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/stat/dealing-with-construction-permits-cost-percent-of-income-per-capita/benin/">Dealing with construction permits, cost in Benin</a> — Statizoid

About this data

Indicator
Dealing with construction permits, cost (% of income per capita)
Unit
% of income per capita
Source
World Bank, Doing Business project (http://www.doingbusiness.org/)
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
56 places, 447 data points, 2005–2012
Last refreshed

Cost is recorded as a percentage of the economy’s income per capita. Only official costs are recorded. All the fees associated with completing the procedures to legally build a warehouse are recorded, including those associated with obtaining land use approvals and preconstruction design clearances; receiving inspections before, during and after construction; getting utility connections; and registering the warehouse property. Nonrecurring taxes required for the completion of the warehouse project also are recorded. The building code, information from local experts and specific regulations and fee schedules are used as sources for costs. If several local partners provide different estimates, the median reported value is used.