Botswana vs Morocco: Dealing with construction permits, cost

Botswana
172.7%
in 2012
Morocco
220.2%
in 2012
Botswana rank
34th
Morocco rank
31st

Dealing with construction permits, cost over time

  • Botswana
  • Morocco
0100200300400200520082012

How they compare

Morocco currently reports 220.2% against 172.7% in Botswana, a difference of 47.5%.

That makes Morocco's figure about 1.3 times Botswana's.

The two have swapped places 4 times across 8 shared years of data; in 2005 it was Morocco ahead.

Botswana ranks 34th and Morocco ranks 31st of 50 countries.

Morocco has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Botswana Morocco Difference Ahead
2000s 290.3% 324.2% 33.9% Morocco
2010s 207.0% 233.6% 26.6% Morocco

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits, cost, Botswana or Morocco?
Morocco, at 220.2% against 172.7% in Botswana as of 2012.
What is the difference in dealing with construction permits, cost between Botswana and Morocco?
47.5%, with Morocco ahead.
How many years of comparable data are there for Botswana and Morocco?
8 years are reported by both, from 2005 to 2012.
How do Botswana and Morocco rank globally for dealing with construction permits, cost?
Botswana ranks 34th and Morocco ranks 31st of 50 countries.
Where does this data come from?
World Bank, Doing Business project (http://www.doingbusiness.org/), published as Dealing with construction permits, cost (% of income per capita). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Botswana vs Morocco: Dealing with construction permits, cost. Statizoid, drawing on World Bank, Doing Business project (http://www.doingbusiness.org/). Retrieved 02 September 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-cost-percent-of-income-per-capita/botswana/morocco/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-cost-percent-of-income-per-capita/botswana/morocco/">Botswana vs Morocco: Dealing with construction permits, cost</a> — Statizoid

About this data

Indicator
Dealing with construction permits, cost (% of income per capita)
Unit
% of income per capita
Source
World Bank, Doing Business project (http://www.doingbusiness.org/)
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
56 places, 447 data points, 2005–2012
Last refreshed

Cost is recorded as a percentage of the economy’s income per capita. Only official costs are recorded. All the fees associated with completing the procedures to legally build a warehouse are recorded, including those associated with obtaining land use approvals and preconstruction design clearances; receiving inspections before, during and after construction; getting utility connections; and registering the warehouse property. Nonrecurring taxes required for the completion of the warehouse project also are recorded. The building code, information from local experts and specific regulations and fee schedules are used as sources for costs. If several local partners provide different estimates, the median reported value is used.