Dealing with construction permits, cost in Morocco

Morocco: Dealing with construction permits, cost was 220.2% in 2012. ▼ Falling

Latest (2012)
220.2%
Change on year
down 6.1%
World rank
31st
of 50 countries
All-time high
383.3%
in 2005
All-time low
220.2%
in 2012
Years of data
8
2005–2012

Dealing with construction permits, cost in Morocco, 2005–2012

01002003004002005200820122005: 383.3 % of income per capita2006: 365.2 % of income per capita2007: 328.1 % of income per capita2008: 286.3 % of income per capita2009: 258 % of income per capita2010: 246.1 % of income per capita2011: 234.6 % of income per capita2012: 220.2 % of income per capita

Source: World Bank, Doing Business project (http://www.doingbusiness.org/). Measured in % of income per capita.

Analysis

The most recent figure for dealing with construction permits, cost in Morocco is 220.2%, measured in 2012. That is the lowest value across all 8 years on record.

The figure is down 6.1% on the previous year and down 42.6% over ten years.

That places Morocco 31st out of 50 countries with data for 2012, putting it in the middle of the range.

Dealing with construction permits, cost in Morocco, year by year

Annual values for Dealing with construction permits, cost (% of income per capita) in Morocco, 2005 to 2012.
Year % of income per capita Change
2005 383.3%
2006 365.2% -4.7%
2007 328.1% -10.2%
2008 286.3% -12.7%
2009 258.0% -9.9%
2010 246.1% -4.6%
2011 234.6% -4.7%
2012 220.2% -6.1%

Averages by decade

DecadeAverage LowestHighest Years
2000s 324.2% 258.0% 383.3% 5
2010s 233.6% 220.2% 246.1% 3

Countries ranked near Morocco

  1. 28 Sierra Leone 265.9% compare
  2. 29 Tunisia 256.0% compare
  3. 30 Sudan 240.3% compare
  4. 32 Kenya 211.9% compare
  5. 33 Central African Republic 194.0% compare
  6. 34 Botswana 172.7% compare

See the full ranking of 56 places →

More private sector data for Morocco

All data for Morocco →

Frequently asked questions

What is dealing with construction permits, cost in Morocco?
Dealing with construction permits, cost in Morocco was 220.2% in 2012, according to World Bank, Doing Business project (http://www.doingbusiness.org/).
What is the highest dealing with construction permits, cost recorded in Morocco?
The highest recorded value was 383.3% in 2005.
What is the lowest dealing with construction permits, cost recorded in Morocco?
The lowest recorded value was 220.2% in 2012.
How does Morocco rank for dealing with construction permits, cost?
Morocco ranks 31st out of 50 countries with data for 2012.
Is dealing with construction permits, cost rising or falling in Morocco?
Over the last ten years it is down 42.6%. The long-run trend across the full record is falling.
Where does this Morocco data come from?
The figures come from World Bank, Doing Business project (http://www.doingbusiness.org/), published as part of Dealing with construction permits, cost (% of income per capita). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 8 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

Share, cite or embed this page

Cite this page

Dealing with construction permits, cost in Morocco. Statizoid, drawing on World Bank, Doing Business project (http://www.doingbusiness.org/). Retrieved 01 September 2026, from https://private-sector.statizoid.com/stat/dealing-with-construction-permits-cost-percent-of-income-per-capita/morocco/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/stat/dealing-with-construction-permits-cost-percent-of-income-per-capita/morocco/">Dealing with construction permits, cost in Morocco</a> — Statizoid

About this data

Indicator
Dealing with construction permits, cost (% of income per capita)
Unit
% of income per capita
Source
World Bank, Doing Business project (http://www.doingbusiness.org/)
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
56 places, 447 data points, 2005–2012
Last refreshed

Cost is recorded as a percentage of the economy’s income per capita. Only official costs are recorded. All the fees associated with completing the procedures to legally build a warehouse are recorded, including those associated with obtaining land use approvals and preconstruction design clearances; receiving inspections before, during and after construction; getting utility connections; and registering the warehouse property. Nonrecurring taxes required for the completion of the warehouse project also are recorded. The building code, information from local experts and specific regulations and fee schedules are used as sources for costs. If several local partners provide different estimates, the median reported value is used.