Chad vs Zimbabwe: Dealing with construction permits, cost

Chad
5,106.8%
in 2012
Zimbabwe
4,423.4%
in 2012
Chad rank
1st
Zimbabwe rank
2nd

Dealing with construction permits, cost over time

  • Chad
  • Zimbabwe
4.0k6.0k8.0k10.0k12.0k14.0k200520082012

How they compare

Chad currently reports 5,106.8% against 4,423.4% in Zimbabwe, a difference of 683.4%.

That makes Chad's figure about 1.2 times Zimbabwe's.

The two have swapped places 2 times across 8 shared years of data; in 2005 it was Chad ahead.

Chad ranks 1st and Zimbabwe ranks 2nd of 50 countries.

Across the 2 decades both report, Chad averaged higher in 1 and Zimbabwe in 1.

Head to head by decade

Decade Chad Zimbabwe Difference Ahead
2000s 7,643.5% 7,302.3% 341.2% Chad
2010s 6,005.5% 6,043.8% 38.3% Zimbabwe

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits, cost, Chad or Zimbabwe?
Chad, at 5,106.8% against 4,423.4% in Zimbabwe as of 2012.
What is the difference in dealing with construction permits, cost between Chad and Zimbabwe?
683.4%, with Chad ahead.
How many years of comparable data are there for Chad and Zimbabwe?
8 years are reported by both, from 2005 to 2012.
How do Chad and Zimbabwe rank globally for dealing with construction permits, cost?
Chad ranks 1st and Zimbabwe ranks 2nd of 50 countries.
Where does this data come from?
World Bank, Doing Business project (http://www.doingbusiness.org/), published as Dealing with construction permits, cost (% of income per capita). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Chad vs Zimbabwe: Dealing with construction permits, cost. Statizoid, drawing on World Bank, Doing Business project (http://www.doingbusiness.org/). Retrieved 03 September 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-cost-percent-of-income-per-capita/chad/zimbabwe/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-cost-percent-of-income-per-capita/chad/zimbabwe/">Chad vs Zimbabwe: Dealing with construction permits, cost</a> — Statizoid

About this data

Indicator
Dealing with construction permits, cost (% of income per capita)
Unit
% of income per capita
Source
World Bank, Doing Business project (http://www.doingbusiness.org/)
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
56 places, 447 data points, 2005–2012
Last refreshed

Cost is recorded as a percentage of the economy’s income per capita. Only official costs are recorded. All the fees associated with completing the procedures to legally build a warehouse are recorded, including those associated with obtaining land use approvals and preconstruction design clearances; receiving inspections before, during and after construction; getting utility connections; and registering the warehouse property. Nonrecurring taxes required for the completion of the warehouse project also are recorded. The building code, information from local experts and specific regulations and fee schedules are used as sources for costs. If several local partners provide different estimates, the median reported value is used.