Dealing with construction permits, cost in Zimbabwe

Zimbabwe: Dealing with construction permits, cost was 4,423.4% in 2012. ▲ Rising

Latest (2012)
4,423.4%
Change on year
down 28.1%
World rank
2nd
of 50 countries
All-time high
13,138.0%
in 2009
All-time low
3,560.0%
in 2005
Years of data
8
2005–2012

Dealing with construction permits, cost in Zimbabwe, 2005–2012

4.0k6.0k8.0k10.0k12.0k14.0k2005200820122005: 3.6k % of income per capita2006: 5.0k % of income per capita2007: 6.0k % of income per capita2008: 8.8k % of income per capita2009: 13.1k % of income per capita2010: 7.6k % of income per capita2011: 6.2k % of income per capita2012: 4.4k % of income per capita

Source: World Bank, Doing Business project (http://www.doingbusiness.org/). Measured in % of income per capita.

Analysis

In 2012, dealing with construction permits, cost in Zimbabwe stood at 4,423.4%.

The figure is down 28.1% on the previous year and up 24.3% over ten years.

Zimbabwe ranks 2nd of 50 countries on this measure, in the top 10%.

Dealing with construction permits, cost in Zimbabwe, year by year

Annual values for Dealing with construction permits, cost (% of income per capita) in Zimbabwe, 2005 to 2012.
Year % of income per capita Change
2005 3,560.0%
2006 5,025.8% +41.2%
2007 5,993.2% +19.2%
2008 8,794.5% +46.7%
2009 13,138.0% +49.4%
2010 7,553.7% -42.5%
2011 6,154.3% -18.5%
2012 4,423.4% -28.1%

Averages by decade

DecadeAverage LowestHighest Years
2000s 7,302.3% 3,560.0% 13,138.0% 5
2010s 6,043.8% 4,423.4% 7,553.7% 3

Countries ranked near Zimbabwe

  1. 1 Chad 5,106.8% compare
  2. 3 Mauritania 2,796.6% compare
  3. 4 Djibouti 2,023.6% compare
  4. 5 Burundi 1,911.9% compare

See the full ranking of 56 places →

More private sector data for Zimbabwe

All data for Zimbabwe →

Frequently asked questions

What is dealing with construction permits, cost in Zimbabwe?
Dealing with construction permits, cost in Zimbabwe was 4,423.4% in 2012, according to World Bank, Doing Business project (http://www.doingbusiness.org/).
What is the highest dealing with construction permits, cost recorded in Zimbabwe?
The highest recorded value was 13,138.0% in 2009.
What is the lowest dealing with construction permits, cost recorded in Zimbabwe?
The lowest recorded value was 3,560.0% in 2005.
How does Zimbabwe rank for dealing with construction permits, cost?
Zimbabwe ranks 2nd out of 50 countries with data for 2012.
Is dealing with construction permits, cost rising or falling in Zimbabwe?
Over the last ten years it is up 24.3%. The long-run trend across the full record is rising.
Where does this Zimbabwe data come from?
The figures come from World Bank, Doing Business project (http://www.doingbusiness.org/), published as part of Dealing with construction permits, cost (% of income per capita). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 8 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

Share, cite or embed this page

Cite this page

Dealing with construction permits, cost in Zimbabwe. Statizoid, drawing on World Bank, Doing Business project (http://www.doingbusiness.org/). Retrieved 01 September 2026, from https://private-sector.statizoid.com/stat/dealing-with-construction-permits-cost-percent-of-income-per-capita/zimbabwe/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/stat/dealing-with-construction-permits-cost-percent-of-income-per-capita/zimbabwe/">Dealing with construction permits, cost in Zimbabwe</a> — Statizoid

About this data

Indicator
Dealing with construction permits, cost (% of income per capita)
Unit
% of income per capita
Source
World Bank, Doing Business project (http://www.doingbusiness.org/)
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
56 places, 447 data points, 2005–2012
Last refreshed

Cost is recorded as a percentage of the economy’s income per capita. Only official costs are recorded. All the fees associated with completing the procedures to legally build a warehouse are recorded, including those associated with obtaining land use approvals and preconstruction design clearances; receiving inspections before, during and after construction; getting utility connections; and registering the warehouse property. Nonrecurring taxes required for the completion of the warehouse project also are recorded. The building code, information from local experts and specific regulations and fee schedules are used as sources for costs. If several local partners provide different estimates, the median reported value is used.