Democratic Republic of Congo vs Niger: Dealing with construction permits, cost (% of income per capita)

Democratic Republic of Congo
1,582.7%
in 2012
Niger
1,612.8%
in 2012
Democratic Republic of Congo rank
8th
Niger rank
7th

Dealing with construction permits, cost (% of income per capita) over time

  • Democratic Republic of Congo
  • Niger
2.0k3.0k4.0k5.0k6.0k200520082012

How they compare

Niger currently reports 1,612.8% against 1,582.7% in Democratic Republic of Congo, a difference of 30.1%.

The two have swapped places 1 time across 8 shared years of data; in 2005 it was Democratic Republic of Congo ahead.

Democratic Republic of Congo ranks 8th and Niger ranks 7th of 50 countries.

Democratic Republic of Congo has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Democratic Republic of Congo Niger Difference Ahead
2000s 5,253.6% 2,021.6% 3,232.0% Democratic Republic of Congo
2010s 1,711.0% 1,661.2% 49.9% Democratic Republic of Congo

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits, cost, Democratic Republic of Congo or Niger?
Niger, at 1,612.8% against 1,582.7% in Democratic Republic of Congo as of 2012.
What is the difference in dealing with construction permits, cost between Democratic Republic of Congo and Niger?
30.1%, with Niger ahead.
How many years of comparable data are there for Democratic Republic of Congo and Niger?
8 years are reported by both, from 2005 to 2012.
How do Democratic Republic of Congo and Niger rank globally for dealing with construction permits, cost?
Democratic Republic of Congo ranks 8th and Niger ranks 7th of 50 countries.
Where does this data come from?
World Bank, Doing Business project (http://www.doingbusiness.org/), published as Dealing with construction permits, cost (% of income per capita). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Democratic Republic of Congo vs Niger: Dealing with construction permits, cost. Statizoid, drawing on World Bank, Doing Business project (http://www.doingbusiness.org/). Retrieved 08 November 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-cost-percent-of-income-per-capita/congo-dem-rep/niger/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-cost-percent-of-income-per-capita/congo-dem-rep/niger/">Democratic Republic of Congo vs Niger: Dealing with construction permits, cost</a> — Statizoid

About this data

Indicator
Dealing with construction permits, cost (% of income per capita)
Unit
% of income per capita
Source
World Bank, Doing Business project (http://www.doingbusiness.org/)
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
56 places, 447 data points, 2005–2012
Last refreshed

Cost is recorded as a percentage of the economy’s income per capita. Only official costs are recorded. All the fees associated with completing the procedures to legally build a warehouse are recorded, including those associated with obtaining land use approvals and preconstruction design clearances; receiving inspections before, during and after construction; getting utility connections; and registering the warehouse property. Nonrecurring taxes required for the completion of the warehouse project also are recorded. The building code, information from local experts and specific regulations and fee schedules are used as sources for costs. If several local partners provide different estimates, the median reported value is used.