Dealing with construction permits, cost in Niger

Niger: Dealing with construction permits, cost was 1,612.8% in 2012. ▼ Falling

Latest (2012)
1,612.8%
Change on year
down 1.9%
World rank
7th
of 50 countries
All-time high
2,190.6%
in 2006
All-time low
1,612.8%
in 2012
Years of data
8
2005–2012

Dealing with construction permits, cost in Niger, 2005–2012

05001.0k1.5k2.0k2005200820122005: 2.1k % of income per capita2006: 2.2k % of income per capita2007: 2.1k % of income per capita2008: 2.0k % of income per capita2009: 1.7k % of income per capita2010: 1.7k % of income per capita2011: 1.6k % of income per capita2012: 1.6k % of income per capita

Source: World Bank, Doing Business project (http://www.doingbusiness.org/). Measured in % of income per capita.

Analysis

The most recent figure for dealing with construction permits, cost in Niger is 1,612.8%, measured in 2012. That is the lowest value across all 8 years on record.

Compared with earlier readings it is down 1.9% on the previous year and down 24.7% over ten years.

That places Niger 7th out of 50 countries with data for 2012, putting it in the top quarter.

Dealing with construction permits, cost in Niger, year by year

Annual values for Dealing with construction permits, cost (% of income per capita) in Niger, 2005 to 2012.
Year % of income per capita Change
2005 2,141.9%
2006 2,190.6% +2.3%
2007 2,070.9% -5.5%
2008 1,976.7% -4.5%
2009 1,727.9% -12.6%
2010 1,726.0% -0.1%
2011 1,644.7% -4.7%
2012 1,612.8% -1.9%

Averages by decade

DecadeAverage LowestHighest Years
2000s 2,021.6% 1,727.9% 2,190.6% 5
2010s 1,661.2% 1,612.8% 1,726.0% 3

Countries ranked near Niger

  1. 4 Djibouti 2,023.6% compare
  2. 5 Burundi 1,911.9% compare
  3. 6 Zambia 1,679.1% compare
  4. 8 Congo, Democratic Republic of the 1,582.7% compare
  5. 9 Malawi 1,198.3% compare
  6. 10 Congo 1,151.4% compare

See the full ranking of 56 places →

More private sector data for Niger

All data for Niger →

Frequently asked questions

What is dealing with construction permits, cost in Niger?
Dealing with construction permits, cost in Niger was 1,612.8% in 2012, according to World Bank, Doing Business project (http://www.doingbusiness.org/).
What is the highest dealing with construction permits, cost recorded in Niger?
The highest recorded value was 2,190.6% in 2006.
What is the lowest dealing with construction permits, cost recorded in Niger?
The lowest recorded value was 1,612.8% in 2012.
How does Niger rank for dealing with construction permits, cost?
Niger ranks 7th out of 50 countries with data for 2012.
Is dealing with construction permits, cost rising or falling in Niger?
Over the last ten years it is down 24.7%. The long-run trend across the full record is falling.
Where does this Niger data come from?
The figures come from World Bank, Doing Business project (http://www.doingbusiness.org/), published as part of Dealing with construction permits, cost (% of income per capita). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 8 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

Share, cite or embed this page

Cite this page

Dealing with construction permits, cost in Niger. Statizoid, drawing on World Bank, Doing Business project (http://www.doingbusiness.org/). Retrieved 31 August 2026, from https://private-sector.statizoid.com/stat/dealing-with-construction-permits-cost-percent-of-income-per-capita/niger/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/stat/dealing-with-construction-permits-cost-percent-of-income-per-capita/niger/">Dealing with construction permits, cost in Niger</a> — Statizoid

About this data

Indicator
Dealing with construction permits, cost (% of income per capita)
Unit
% of income per capita
Source
World Bank, Doing Business project (http://www.doingbusiness.org/)
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
56 places, 447 data points, 2005–2012
Last refreshed

Cost is recorded as a percentage of the economy’s income per capita. Only official costs are recorded. All the fees associated with completing the procedures to legally build a warehouse are recorded, including those associated with obtaining land use approvals and preconstruction design clearances; receiving inspections before, during and after construction; getting utility connections; and registering the warehouse property. Nonrecurring taxes required for the completion of the warehouse project also are recorded. The building code, information from local experts and specific regulations and fee schedules are used as sources for costs. If several local partners provide different estimates, the median reported value is used.