Ethiopia vs Rwanda: Dealing with construction permits, cost
Dealing with construction permits, cost over time
- Ethiopia
- Rwanda
How they compare
Rwanda currently reports 278.4% against 275.6% in Ethiopia, a difference of 2.8%.
The two have swapped places 1 time across 8 shared years of data; in 2005 it was Ethiopia ahead.
Ethiopia ranks 27th and Rwanda ranks 26th of 50 countries.
Ethiopia has averaged higher in every one of the 2 decades both report.
Head to head by decade
| Decade | Ethiopia | Rwanda | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 1,053.9% | 729.7% | 324.2% | Ethiopia |
| 2010s | 350.5% | 313.4% | 37.1% | Ethiopia |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher dealing with construction permits, cost, Ethiopia or Rwanda?
- Rwanda, at 278.4% against 275.6% in Ethiopia as of 2012.
- What is the difference in dealing with construction permits, cost between Ethiopia and Rwanda?
- 2.8%, with Rwanda ahead.
- How many years of comparable data are there for Ethiopia and Rwanda?
- 8 years are reported by both, from 2005 to 2012.
- How do Ethiopia and Rwanda rank globally for dealing with construction permits, cost?
- Ethiopia ranks 27th and Rwanda ranks 26th of 50 countries.
- Where does this data come from?
- World Bank, Doing Business project (http://www.doingbusiness.org/), published as Dealing with construction permits, cost (% of income per capita). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
Cost is recorded as a percentage of the economy’s income per capita. Only official costs are recorded. All the fees associated with completing the procedures to legally build a warehouse are recorded, including those associated with obtaining land use approvals and preconstruction design clearances; receiving inspections before, during and after construction; getting utility connections; and registering the warehouse property. Nonrecurring taxes required for the completion of the warehouse project also are recorded. The building code, information from local experts and specific regulations and fee schedules are used as sources for costs. If several local partners provide different estimates, the median reported value is used.