Dealing with construction permits, cost in Rwanda

Rwanda: Dealing with construction permits, cost was 278.4% in 2012. ▼ Falling

Latest (2012)
278.4%
Change on year
down 10.8%
World rank
26th
of 50 countries
All-time high
918.2%
in 2005
All-time low
278.4%
in 2012
Years of data
8
2005–2012

Dealing with construction permits, cost in Rwanda, 2005–2012

2004006008001.0k2005200820122005: 918.2 % of income per capita2006: 863.3 % of income per capita2007: 814.2 % of income per capita2008: 601.2 % of income per capita2009: 451.7 % of income per capita2010: 349.8 % of income per capita2011: 312 % of income per capita2012: 278.4 % of income per capita

Source: World Bank, Doing Business project (http://www.doingbusiness.org/). Measured in % of income per capita.

Analysis

In 2012, dealing with construction permits, cost in Rwanda stood at 278.4%. That is the lowest value across all 8 years on record.

Compared with earlier readings it is down 10.8% on the previous year and down 69.7% over ten years.

That places Rwanda 26th out of 50 countries with data for 2012, putting it in the middle of the range.

Dealing with construction permits, cost in Rwanda, year by year

Annual values for Dealing with construction permits, cost (% of income per capita) in Rwanda, 2005 to 2012.
Year % of income per capita Change
2005 918.2%
2006 863.3% -6.0%
2007 814.2% -5.7%
2008 601.2% -26.2%
2009 451.7% -24.9%
2010 349.8% -22.6%
2011 312.0% -10.8%
2012 278.4% -10.8%

Averages by decade

DecadeAverage LowestHighest Years
2000s 729.7% 451.7% 918.2% 5
2010s 313.4% 278.4% 349.8% 3

Countries ranked near Rwanda

  1. 23 Nigeria 417.7% compare
  2. 24 Sao Tome and Principe 386.7% compare
  3. 25 Burkina Faso 380.7% compare
  4. 27 Ethiopia 275.6% compare
  5. 28 Sierra Leone 265.9% compare
  6. 29 Tunisia 256.0% compare

See the full ranking of 56 places →

More private sector data for Rwanda

All data for Rwanda →

Frequently asked questions

What is dealing with construction permits, cost in Rwanda?
Dealing with construction permits, cost in Rwanda was 278.4% in 2012, according to World Bank, Doing Business project (http://www.doingbusiness.org/).
What is the highest dealing with construction permits, cost recorded in Rwanda?
The highest recorded value was 918.2% in 2005.
What is the lowest dealing with construction permits, cost recorded in Rwanda?
The lowest recorded value was 278.4% in 2012.
How does Rwanda rank for dealing with construction permits, cost?
Rwanda ranks 26th out of 50 countries with data for 2012.
Is dealing with construction permits, cost rising or falling in Rwanda?
Over the last ten years it is down 69.7%. The long-run trend across the full record is falling.
Where does this Rwanda data come from?
The figures come from World Bank, Doing Business project (http://www.doingbusiness.org/), published as part of Dealing with construction permits, cost (% of income per capita). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 8 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

Share, cite or embed this page

Cite this page

Dealing with construction permits, cost in Rwanda. Statizoid, drawing on World Bank, Doing Business project (http://www.doingbusiness.org/). Retrieved 31 August 2026, from https://private-sector.statizoid.com/stat/dealing-with-construction-permits-cost-percent-of-income-per-capita/rwanda/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/stat/dealing-with-construction-permits-cost-percent-of-income-per-capita/rwanda/">Dealing with construction permits, cost in Rwanda</a> — Statizoid

About this data

Indicator
Dealing with construction permits, cost (% of income per capita)
Unit
% of income per capita
Source
World Bank, Doing Business project (http://www.doingbusiness.org/)
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
56 places, 447 data points, 2005–2012
Last refreshed

Cost is recorded as a percentage of the economy’s income per capita. Only official costs are recorded. All the fees associated with completing the procedures to legally build a warehouse are recorded, including those associated with obtaining land use approvals and preconstruction design clearances; receiving inspections before, during and after construction; getting utility connections; and registering the warehouse property. Nonrecurring taxes required for the completion of the warehouse project also are recorded. The building code, information from local experts and specific regulations and fee schedules are used as sources for costs. If several local partners provide different estimates, the median reported value is used.