Ethiopia vs Sudan: Dealing with construction permits, cost
Dealing with construction permits, cost over time
- Ethiopia
- Sudan
How they compare
Ethiopia currently reports 275.6% against 240.3% in Sudan, a difference of 35.3%.
That makes Ethiopia's figure about 1.1 times Sudan's.
The two have swapped places 4 times across 8 shared years of data; in 2005 it was Ethiopia ahead.
Ethiopia ranks 27th and Sudan ranks 30th of 50 countries.
Sudan has averaged higher in every one of the 2 decades both report.
Head to head by decade
| Decade | Ethiopia | Sudan | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 1,053.9% | 24,836.8% | 23,782.9% | Sudan |
| 2010s | 350.5% | 366.3% | 15.8% | Sudan |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher dealing with construction permits, cost, Ethiopia or Sudan?
- Ethiopia, at 275.6% against 240.3% in Sudan as of 2012.
- What is the difference in dealing with construction permits, cost between Ethiopia and Sudan?
- 35.3%, with Ethiopia ahead.
- How many years of comparable data are there for Ethiopia and Sudan?
- 8 years are reported by both, from 2005 to 2012.
- How do Ethiopia and Sudan rank globally for dealing with construction permits, cost?
- Ethiopia ranks 27th and Sudan ranks 30th of 50 countries.
- Where does this data come from?
- World Bank, Doing Business project (http://www.doingbusiness.org/), published as Dealing with construction permits, cost (% of income per capita). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
Cost is recorded as a percentage of the economy’s income per capita. Only official costs are recorded. All the fees associated with completing the procedures to legally build a warehouse are recorded, including those associated with obtaining land use approvals and preconstruction design clearances; receiving inspections before, during and after construction; getting utility connections; and registering the warehouse property. Nonrecurring taxes required for the completion of the warehouse project also are recorded. The building code, information from local experts and specific regulations and fee schedules are used as sources for costs. If several local partners provide different estimates, the median reported value is used.