Dealing with construction permits, cost in Sudan

Sudan: Dealing with construction permits, cost was 240.3% in 2012. ◆ Volatile

Latest (2012)
240.3%
Change on year
down 39.3%
World rank
30th
of 50 countries
All-time high
67,560.8%
in 2007
All-time low
240.3%
in 2012
Years of data
8
2005–2012

Dealing with construction permits, cost in Sudan, 2005–2012

020.0k40.0k60.0k2005200820122005: 867.6 % of income per capita2006: 736.6 % of income per capita2007: 67.6k % of income per capita2008: 54.5k % of income per capita2009: 496.3 % of income per capita2010: 462.9 % of income per capita2011: 395.8 % of income per capita2012: 240.3 % of income per capita

Source: World Bank, Doing Business project (http://www.doingbusiness.org/). Measured in % of income per capita.

Analysis

Sudan recorded 240.3% for dealing with construction permits, cost in 2012. That is the lowest value across all 8 years on record.

The figure is down 39.3% on the previous year and down 72.3% over ten years.

Sudan ranks 30th of 50 countries on this measure, in the middle of the range.

Dealing with construction permits, cost in Sudan, year by year

Annual values for Dealing with construction permits, cost (% of income per capita) in Sudan, 2005 to 2012.
Year % of income per capita Change
2005 867.6%
2006 736.6% -15.1%
2007 67,560.8% +9072.0%
2008 54,522.9% -19.3%
2009 496.3% -99.1%
2010 462.9% -6.7%
2011 395.8% -14.5%
2012 240.3% -39.3%

Averages by decade

DecadeAverage LowestHighest Years
2000s 24,836.8% 496.3% 67,560.8% 5
2010s 366.3% 240.3% 462.9% 3

Countries ranked near Sudan

  1. 27 Ethiopia 275.6% compare
  2. 28 Sierra Leone 265.9% compare
  3. 29 Tunisia 256.0% compare
  4. 31 Morocco 220.2% compare
  5. 32 Kenya 211.9% compare
  6. 33 Central African Republic 194.0% compare

See the full ranking of 56 places →

More private sector data for Sudan

All data for Sudan →

Frequently asked questions

What is dealing with construction permits, cost in Sudan?
Dealing with construction permits, cost in Sudan was 240.3% in 2012, according to World Bank, Doing Business project (http://www.doingbusiness.org/).
What is the highest dealing with construction permits, cost recorded in Sudan?
The highest recorded value was 67,560.8% in 2007.
What is the lowest dealing with construction permits, cost recorded in Sudan?
The lowest recorded value was 240.3% in 2012.
How does Sudan rank for dealing with construction permits, cost?
Sudan ranks 30th out of 50 countries with data for 2012.
Is dealing with construction permits, cost rising or falling in Sudan?
Over the last ten years it is down 72.3%. The long-run trend across the full record is volatile.
Where does this Sudan data come from?
The figures come from World Bank, Doing Business project (http://www.doingbusiness.org/), published as part of Dealing with construction permits, cost (% of income per capita). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 8 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

Share, cite or embed this page

Cite this page

Dealing with construction permits, cost in Sudan. Statizoid, drawing on World Bank, Doing Business project (http://www.doingbusiness.org/). Retrieved 01 September 2026, from https://private-sector.statizoid.com/stat/dealing-with-construction-permits-cost-percent-of-income-per-capita/sudan/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/stat/dealing-with-construction-permits-cost-percent-of-income-per-capita/sudan/">Dealing with construction permits, cost in Sudan</a> — Statizoid

About this data

Indicator
Dealing with construction permits, cost (% of income per capita)
Unit
% of income per capita
Source
World Bank, Doing Business project (http://www.doingbusiness.org/)
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
56 places, 447 data points, 2005–2012
Last refreshed

Cost is recorded as a percentage of the economy’s income per capita. Only official costs are recorded. All the fees associated with completing the procedures to legally build a warehouse are recorded, including those associated with obtaining land use approvals and preconstruction design clearances; receiving inspections before, during and after construction; getting utility connections; and registering the warehouse property. Nonrecurring taxes required for the completion of the warehouse project also are recorded. The building code, information from local experts and specific regulations and fee schedules are used as sources for costs. If several local partners provide different estimates, the median reported value is used.