Lesotho vs Uganda: Dealing with construction permits, cost

Lesotho
950.4%
in 2012
Uganda
853.1%
in 2012
Lesotho rank
13th
Uganda rank
14th

Dealing with construction permits, cost over time

  • Lesotho
  • Uganda
5001.0k1.5k2.0k200520082012

How they compare

Lesotho currently reports 950.4% against 853.1% in Uganda, a difference of 97.3%.

That makes Lesotho's figure about 1.1 times Uganda's.

The two have swapped places 1 time across 8 shared years of data; in 2005 it was Uganda ahead.

Lesotho ranks 13th and Uganda ranks 14th of 50 countries.

Across the 2 decades both report, Lesotho averaged higher in 1 and Uganda in 1.

Head to head by decade

Decade Lesotho Uganda Difference Ahead
2000s 719.4% 1,636.2% 916.7% Uganda
2010s 1,027.8% 954.6% 73.1% Lesotho

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits, cost, Lesotho or Uganda?
Lesotho, at 950.4% against 853.1% in Uganda as of 2012.
What is the difference in dealing with construction permits, cost between Lesotho and Uganda?
97.3%, with Lesotho ahead.
How many years of comparable data are there for Lesotho and Uganda?
8 years are reported by both, from 2005 to 2012.
How do Lesotho and Uganda rank globally for dealing with construction permits, cost?
Lesotho ranks 13th and Uganda ranks 14th of 50 countries.
Where does this data come from?
World Bank, Doing Business project (http://www.doingbusiness.org/), published as Dealing with construction permits, cost (% of income per capita). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Lesotho vs Uganda: Dealing with construction permits, cost. Statizoid, drawing on World Bank, Doing Business project (http://www.doingbusiness.org/). Retrieved 04 September 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-cost-percent-of-income-per-capita/lesotho/uganda/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-cost-percent-of-income-per-capita/lesotho/uganda/">Lesotho vs Uganda: Dealing with construction permits, cost</a> — Statizoid

About this data

Indicator
Dealing with construction permits, cost (% of income per capita)
Unit
% of income per capita
Source
World Bank, Doing Business project (http://www.doingbusiness.org/)
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
56 places, 447 data points, 2005–2012
Last refreshed

Cost is recorded as a percentage of the economy’s income per capita. Only official costs are recorded. All the fees associated with completing the procedures to legally build a warehouse are recorded, including those associated with obtaining land use approvals and preconstruction design clearances; receiving inspections before, during and after construction; getting utility connections; and registering the warehouse property. Nonrecurring taxes required for the completion of the warehouse project also are recorded. The building code, information from local experts and specific regulations and fee schedules are used as sources for costs. If several local partners provide different estimates, the median reported value is used.