Lesotho vs Uganda: Dealing with construction permits, cost
Dealing with construction permits, cost over time
- Lesotho
- Uganda
How they compare
Lesotho currently reports 950.4% against 853.1% in Uganda, a difference of 97.3%.
That makes Lesotho's figure about 1.1 times Uganda's.
The two have swapped places 1 time across 8 shared years of data; in 2005 it was Uganda ahead.
Lesotho ranks 13th and Uganda ranks 14th of 50 countries.
Across the 2 decades both report, Lesotho averaged higher in 1 and Uganda in 1.
Head to head by decade
| Decade | Lesotho | Uganda | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 719.4% | 1,636.2% | 916.7% | Uganda |
| 2010s | 1,027.8% | 954.6% | 73.1% | Lesotho |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher dealing with construction permits, cost, Lesotho or Uganda?
- Lesotho, at 950.4% against 853.1% in Uganda as of 2012.
- What is the difference in dealing with construction permits, cost between Lesotho and Uganda?
- 97.3%, with Lesotho ahead.
- How many years of comparable data are there for Lesotho and Uganda?
- 8 years are reported by both, from 2005 to 2012.
- How do Lesotho and Uganda rank globally for dealing with construction permits, cost?
- Lesotho ranks 13th and Uganda ranks 14th of 50 countries.
- Where does this data come from?
- World Bank, Doing Business project (http://www.doingbusiness.org/), published as Dealing with construction permits, cost (% of income per capita). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
Cost is recorded as a percentage of the economy’s income per capita. Only official costs are recorded. All the fees associated with completing the procedures to legally build a warehouse are recorded, including those associated with obtaining land use approvals and preconstruction design clearances; receiving inspections before, during and after construction; getting utility connections; and registering the warehouse property. Nonrecurring taxes required for the completion of the warehouse project also are recorded. The building code, information from local experts and specific regulations and fee schedules are used as sources for costs. If several local partners provide different estimates, the median reported value is used.