Dealing with construction permits, cost in Lesotho

Lesotho: Dealing with construction permits, cost was 950.4% in 2012. ▲ Rising

Latest (2012)
950.4%
Change on year
down 7.3%
World rank
13th
of 50 countries
All-time high
1,107.6%
in 2010
All-time low
587.4%
in 2007
Years of data
8
2005–2012

Dealing with construction permits, cost in Lesotho, 2005–2012

02505007501.0k2005200820122005: 673.1 % of income per capita2006: 643.3 % of income per capita2007: 587.4 % of income per capita2008: 596 % of income per capita2009: 1.1k % of income per capita2010: 1.1k % of income per capita2011: 1.0k % of income per capita2012: 950.4 % of income per capita

Source: World Bank, Doing Business project (http://www.doingbusiness.org/). Measured in % of income per capita.

Analysis

In 2012, dealing with construction permits, cost in Lesotho stood at 950.4%.

That represents a change of down 7.3% on the previous year and up 41.2% over ten years.

That places Lesotho 13th out of 50 countries with data for 2012, putting it in the top quarter.

Dealing with construction permits, cost in Lesotho, year by year

Annual values for Dealing with construction permits, cost (% of income per capita) in Lesotho, 2005 to 2012.
Year % of income per capita Change
2005 673.1%
2006 643.3% -4.4%
2007 587.4% -8.7%
2008 596.0% +1.5%
2009 1,097.4% +84.1%
2010 1,107.6% +0.9%
2011 1,025.3% -7.4%
2012 950.4% -7.3%

Averages by decade

DecadeAverage LowestHighest Years
2000s 719.4% 587.4% 1,097.4% 5
2010s 1,027.8% 950.4% 1,107.6% 3

Countries ranked near Lesotho

  1. 10 Congo 1,151.4% compare
  2. 11 Madagascar 1,116.9% compare
  3. 12 Cameroon 1,008.7% compare
  4. 14 Uganda 853.1% compare
  5. 15 Guinea-Bissau 785.2% compare
  6. 16 Tanzania, United Republic of 564.6% compare

See the full ranking of 56 places →

More private sector data for Lesotho

All data for Lesotho →

Frequently asked questions

What is dealing with construction permits, cost in Lesotho?
Dealing with construction permits, cost in Lesotho was 950.4% in 2012, according to World Bank, Doing Business project (http://www.doingbusiness.org/).
What is the highest dealing with construction permits, cost recorded in Lesotho?
The highest recorded value was 1,107.6% in 2010.
What is the lowest dealing with construction permits, cost recorded in Lesotho?
The lowest recorded value was 587.4% in 2007.
How does Lesotho rank for dealing with construction permits, cost?
Lesotho ranks 13th out of 50 countries with data for 2012.
Is dealing with construction permits, cost rising or falling in Lesotho?
Over the last ten years it is up 41.2%. The long-run trend across the full record is rising.
Where does this Lesotho data come from?
The figures come from World Bank, Doing Business project (http://www.doingbusiness.org/), published as part of Dealing with construction permits, cost (% of income per capita). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 8 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

Share, cite or embed this page

Cite this page

Dealing with construction permits, cost in Lesotho. Statizoid, drawing on World Bank, Doing Business project (http://www.doingbusiness.org/). Retrieved 31 August 2026, from https://private-sector.statizoid.com/stat/dealing-with-construction-permits-cost-percent-of-income-per-capita/lesotho/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/stat/dealing-with-construction-permits-cost-percent-of-income-per-capita/lesotho/">Dealing with construction permits, cost in Lesotho</a> — Statizoid

About this data

Indicator
Dealing with construction permits, cost (% of income per capita)
Unit
% of income per capita
Source
World Bank, Doing Business project (http://www.doingbusiness.org/)
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
56 places, 447 data points, 2005–2012
Last refreshed

Cost is recorded as a percentage of the economy’s income per capita. Only official costs are recorded. All the fees associated with completing the procedures to legally build a warehouse are recorded, including those associated with obtaining land use approvals and preconstruction design clearances; receiving inspections before, during and after construction; getting utility connections; and registering the warehouse property. Nonrecurring taxes required for the completion of the warehouse project also are recorded. The building code, information from local experts and specific regulations and fee schedules are used as sources for costs. If several local partners provide different estimates, the median reported value is used.